Is your vessel ready for Offshore Construction?
Offshore Construction Associates
Your preferred choice for offshore wind construction expertise
An analysis of the complex jigsaw and typical challenges of vessel mobilization for offshore wind farm transport and installation projects.?
Part 1: Where it fits in the project timeline and why is it important??
After many months or years spent on offshore wind farm design and preparation, and following the long and complex fabrication process, a project finally enters the offshore construction phase. At this point all the transport and installation activities will be performed until all foundations, turbines, cables and substations are built and ready to operate.
?A variety of different vessels are needed for construction, starting from the main installation vessels (e.g. heavy lift crane vessels for installation of foundations and WTG components, cable laying vessels, etc.), and including a number of other vessels, some being an integral part of the transport and installation fleet (cargo barges, towing & anchor handling tugs, etc.), others used for assisting operations like crew transfer vessels, supply vessels and other similar types.
The process of preparing all the above vessels for the performance of their assigned scope is called #Vessel Mobilization?.
At first sight Vessel Mobilization could appear as a rather simple and straightforward operation, consisting of merely loading and securing the required equipment in position on the vessel deck, performing some tests, mobilizing the crew and then sailing to the offshore site. Unfortunately, it is much easier said than done. All mobilizations will at some point face a series of challenges.
To highlight the importance and complexity of the vessel mobilization phase, it can be observed that this is the first moment in the entire project when:
领英推荐
-?????????the full transport and installation engineering and preparation activities which have taken place over the years start to take shape on an actual work site.
-?????????the project organization has its first direct contact with the marine and offshore construction environment.
-?????????the vast majority of disciplines, scopes and stakeholders are present and directly involved in the work simultaneously and in the same place.
And it goes without saying, as vessel mobilization is the first step of the offshore construction works, having a proper start is fundamental and will benefit the full offshore construction scope.