Your Reliable Technical Advisor
TüV NORD Smart Energy

Your Reliable Technical Advisor


Factory Inspection before Production

Conduct factory inspection in designated workshop before production starts and eliminate all non-conformities.

  • Purchase Order, Technical Agreements, Quality Plan (QP)
  • Related standards and requirements of IEC/ISO
  • Rich factory inspection experiences of TüV NORD


In-line Inspection



Third-party Laboratory Testing

  • In-line Verification
  • Some processes can be verified in-line measurements such as pull strength of soldering ribbons, dimension, etc.
  • Third-party Laboratory Test
  • Some process cannot be verified by in-line measurements such as LID/LETID, Potential Induced Degradation Test, Gel Content Test, Peel-off Test etc.


Pre-shipment Inspection

Based on shipment plan, take certain amount of samples and conduct pre-shipment inspection.



要查看或添加评论,请登录

TüV NORD China的更多文章

社区洞察