WORLDS Biggest Crane's How would you guarantee everyone's safety?
High Risk? No Problem. Eliminating risk is vital to all Crane erections.
Let's Break this monster down and eliminate risk.
A) These 2 Cranes need a great operator.
B) The inspection needs 3 layers of approval.
1) Inspector that knows this crane.
2) An inspector that will review the 1st inspectors work- A electronic inspection system designed to register the inspector’s presence so he must actually touch the crane. The inspector will have a state-of-the-art camera on his Helmet recording all of his activities.
3) Finally,someone like myself will watch the hours of film like a Coach for a championship team, Gleaning the smallest concern I.E a missing pin or a cable out of place.
C) This project needs a "High Risk" Safety pre plan meeting agenda designed by a crane plan architect. The agenda must be air tight covering only points specific to the Crane erection.
D) A Company that has qualified & competent personal that has years of safe experience erecting Cranes of this size.
For this information and more about planning for the world's largest crane set up visit
https://highriskconsultant.com/f/sky-hook-coming-to-ny?blogcategory=Planning+for+a+BIG+crane