Work Sequence of Building Construction

Work Sequence of Building Construction

A constructor needs to follow the work sequence precisely. Else, the whole process of erecting construction might crash. Therefore it's veritably important to maintain and follow the work sequence in erecting construction precisely. Let us see how it should be done properly.

Paper Work

The paperwork for the building needs to be finished even before the work actually begins. This includes:-

  • Preparation of drawings and diagrams
  • Material and construction cost estimation
  • Labor costs and contingency measures
  • Approval of design from local development authority
  • Any other legal work that may be necessary

Layout Marking

The plan boundaries need to be marked on the ground. Only the approved plan should be marked down. The ground inside and outside the point should be gutted of any undesirable rudiments. Accurate confines and exposures must be followed while marking down the layout.

Excavation Work

The foundations of the structure need to be placed under the ground position, onto a solid bed. For this, important excavation work needs to be done on point according to design. The wall foundations and column foundations may bear different types of foundations. For this reason, different quantities of excavation may need to bedone.Suitable ministry like slumberers need to be used for large scale excavation. Not only that, you need to carry off the shoveled earth to a suitable position as well.

Read more

要查看或添加评论,请登录

社区洞察

其他会员也浏览了