WHY "COPQ" was so HIGH ??
This case study was conducted by me for a well known & very positive SME, very recently and following potential/probable causes listed out during "BRAINSTORMING" session:
- "5S" not implemented as a habit.
- "KRA" not defined for all.
- "Scrap" disposal is not being done on time.
- "QUALITY POLICY" not understood by all employees in an intended manner.
- "Quality system procedures" made by one person of the company.
- Inadequate, incorrect control plans & checkpoints.
- "CUSTOMER NEEDS" & requirements not captured completely & perfectly and even not addressed in the control plan.
- "WORK INSTRUCTIONS" are made in English & those are not well understood by workmen.
- "OVER PRODUCTION" / Unwanted productions.
- "INADEQUATE" relevant training.
- Training identification is done without the involvement of employees.
- "DEMOTIVATED" employees.
- "ABSENCE " of basic infrastructures.
- "TESTING FACILITIES" treated as cost addition in budgeting.
- "PREVENTIVE MAINTENANCE" mostly missing.
- "FMEA" not being conducted as proactive improvement tools, but treated as a showcase to customers.
- Inadequate FMEA training due to lack of internal trainers.
- "SPC" is not being done honestly.
- "PPAP" records are not being treated as for the purpose of internal improvements.
- "ECNs" are not being effectively monitored for effectiveness.
- No "KAIZEN" culture in the company.
- No "QCC" exercise, team formation , project selection,implementation & celebration.
- Problem-solving techniques are not being used by the team.
- Lack of honest "CALIBRATIONS".
- "CAPA" is not being made because root cause identification exercise is not being done. Everything on the past experience basis.
- CAPA is treated as customer's satisfaction normal paper, not as a business project.
- "RPN" numbers & it's reduction methodology is not clearly understood by all group members.
- Real "OEE" calculation is missing in the system.
- More numbers of non-value added meetings are conducted by top management.
- " DESIGN CHANGES" are not updated timely.
- "OBSOLETE" items &documents are not being disposed of on time.
- "CUSTOMER's APPROVAL" are missing in many cases.
- "NO ROUTE CARD" is being implemented for FIFO.
- Inadequate product identification & traceability starting from receipt of RM to product dispatches.
- Standardisation is missing.
- "SOPs" are not made for all processes.
- SOPs are not in local language & not adequate too.
- " POKA-YOKE: not implemented at critical operation, where monotonous work is going on.
- By-passing of Poka-yoke by operators & no actions by the supervisor.
- A shortcut in operations. One operation bypassed to meet the production quantity.
- Very low numbers of low-cost automation( LCA).
- VALUE STREAM mapping training is missing.
- Deskilling/ multitasking not being done as a system requirement.
- Rejection/rework is treated as a continuous improvement project.
- Detail MIS review is missing.
- TOOL HISTORY CARD is not being filled honestly by tool room in charge.
- High fluctuations of voltage in summer & no proactive actions are taken.
- Bad quality water is being used in the process.
- No accurate & proper temperature control mechanism is being implemented.
- Machines are working without chiller even in summer.
- Without looking at output quality of the product, Cycle time reduced to get maximum output.
- TPM is missing on the machine.
- No pre-training to contract labor ( new entrants).
- Fear of job security at all level of a hierarchy.
- Incapable of PPC/ wrong production planning.
- Very poor material handling mechanism.
- Very poor storage system.
- FIFO concept & implementation is missing.
- Unwanted cost-saving actions.
- ILL/ negative minded employees.
- Many employees having their own family problem & always in a disturbed mind.
- Applying less operation time than really required ( Less time, less temperature, less pressure, higher RPM)
- Constant mental pressure due to extra work.
- Operations at an old machine by old & obsolete technology.
- Management wanted a cheaper solution by neglecting the required quality.
- Incapable supervisor( Low qualification, no training & low skill level).
- Known malfunctioning by negatively minded employees.
- Use of known inferior quality of RM.
- Improper mold/does design (Location/ centering/ovality/perpendicularity/parallelism/flatness)
- Not on time & wrong mold/dies maintenance.
- Wrong loading & unloading method
- Monotonous & manual working by the same operator for many months/years.
- Wrong packing &packaging design.
- Wrong & unsafe transportation method.
- Higher dust & moisture level.
- Faulty control setting.
- Quality approval on experience basis, not proper tools & techniques used for that.
- To meet the delivery quantity, faulty materials mixed with an ok material ( Knowingly).
- Poor capability supplier ( Approval based on reference & good nature, not at good system basis).
- Improper process parameters used ( Speed, feed, pressure, temperature).
- Initial setting is done by untrained people, not by an expert/ experienced people.
- Improper rework methods used for rectification,
- Use of less cooling & settling time.
- Operators negligence( known/ aware but not done correctly due to some extra efforts required).
- Improper mixing of raw material, paints
- Known dual standards quality of same products ( Only for market application, only for OEM applications)
- Processing of slow-moving stocks without verification of quality.
- Misunderstanding due to puzzle mind.
- old standards used due to lack of correct information at the department level.
- Machine capability low.
- Due to the bad relationship between two contractors.
- No patrol inspection at night.
- Low capability supervisor's deployment at night shift.
- Poor operation layout( Zig-zag)
- Poor line balancing/ batch production.
- Improper cleaning of working surface ( Chips/ swarf accumulations).
- Excessive tightening/ lose clamping.
- Mixing of foreign material( Rubber mixed with the metal particle, Aluminium mixed with brass)
- Fallen material kept with the ok material without visual inspection.
- Wrong sampling plan used for inconsistent supplier
- Wrong measuring method( Attribute checking for the Variable i.e surface finish checking by visual method)
CEO at Maurya Techno Consulting Services
6 年You had open the SMEs eyes, why top professional or consultant required
Director-Operations & Business Excellence ||Motivator ||Author ||Hindi Poet|| WCMS Consultant||
6 年BRAINSTORMING is a really very effective & motivative analytical tool.
Asif Saifal