Why Construction Projects Failed ???

Why Construction Projects Failed ???

According To AACE Practice :

1-Failure of the project team to understand and fully comprehend the scope of the project and/or the attendant risks.

2-Failure or poor execution by the project team in developing and implementing a comprehensive plan.

3-Failure by the project team to revise the plan when major changes have been identified and incorporated into the scope of work.

Failure of the major stakeholders (owner, underwriter, and bonding company) to financially support the project as programmed , thus, delaying or stopping the work.

4-Failure of the stakeholders to communicate their different interpretations of the project plan and/or goals.

Alternatively, failure of the project team to reconcile known interpretation of the differences. And,

5-Failure of the project team to develop essential non planning methodologies during project development and execution.


Mohamed Shams

PMP?& RMP? & SP? & MAPM | Senior Cost Engineer | Quantity Surveyor | Commercial Manager | Cost Control & Estimation | Contract & Claims Specialist | Budgeting |Tendering | Value Engineering .

1 个月

Causes of Project Failure

回复

要查看或添加评论,请登录

Mohamed Shams的更多文章

  • OBS , ORGANIZATION BREAK DOWN STRUCTURE

    OBS , ORGANIZATION BREAK DOWN STRUCTURE

    reflects the company’s organization as integrated with a particular PMO to support a specific project. Functional…

  • COST ESTIMATE

    COST ESTIMATE

    Cost estimating is the iterative predictive process used to quantify , cost , and price the resources required by a…

  • asset Management

    asset Management

    The lifecycle of a strategic asset can be summarized by the following five (5) stages: 1- Ideation – Determine an…

  • RISK RESPONCES

    RISK RESPONCES

    for threats : 1-Avoid: Involves eliminating either the probability or impact. This can be done by either clarifying…

  • Important Terms In Cost Management

    Important Terms In Cost Management

    Common language terms and their symbols for time value of money problems are : P = present value F = future value A =…

  • SUCCESS INDEX (SI)

    SUCCESS INDEX (SI)

    SUCCESS INDEX (SI) Numerical evaluation of total organizational performance is possible using the Success Index(SI). It…

  • Toxic Conflict between project manager and cost engineer

    Toxic Conflict between project manager and cost engineer

    Conflict between these roles can reach Project Failure . .

  • VALUE ENGINEERING

    VALUE ENGINEERING

    Steps: 1- An organized creative approach to cost reduction. 2- Targets function versus technique.

  • BOE : BASIS OF ESTIMATE

    BOE : BASIS OF ESTIMATE

    The BOE clearly define the design basis, planning basis, cost basis, and risk basis of the estimate . 1-Design Basis:…

    2 条评论
  • Conceptual Estimating

    Conceptual Estimating

    Conceptual estimating methods are typically used for Class 5 and Class 4 (and sometimes for Class 3) estimates. these…