Why the construction establishment resists Construction Management Agency as a delivery methodology.
PEMB Steel members in church sanctuary construction, by S.Loy

Why the construction establishment resists Construction Management Agency as a delivery methodology.

The construction industry is gigantic.....it has been around for centuries in this country alone....an industry with that much inertia does not embrace change easily. Introducing new processes and methodology is much like trying to turn an aircraft carrier with a boat oar. You can get beat up pretty good and not even effect the ship!

The CM Agency (CMa) or Multiple Prime Contracts method of project delivery is significantly different than any other method used in the USA. It is the most innovative and progressive methodology in today's marketplace. It saves money and provides complete transparency of where the money goes....so why is it being resisted by many of the larger construction companies in the USA?

The answer is simple....Greed. General Contractors that have been in business for decades or centuries have so much inertia in their organization and staffs they have no reason to embrace a methodology which would require significant and fundamental retooling of their staff's skill sets, at a minimum, and most likely a significant paradigm shift in their corporate culture and philosophy.

The orchestrated strategy to discredit CMa is to sound false alarms about the additional liability the owner assumes because the owner is directly contracted with the (sub)contractors. The arguments point out increased owner risk for safety, contractor defaults, conflict resolution, warranty work, workers comp audits et al. Every red flag waived is exactly why the owner would have a CM acting as their agent! A qualified CM will protect the owner from those risks with the skill set required to be a professional CM Agent.

The skills required to be a CMa are different than those of a GC or CM at risk. There is a paradigm shift required when changing hats from that of a GC or CM defending the amount and scope of your contract to that of a CM Agent defending the integrity of the project as an advocate for the owner. As soon as the price in a contract is fixed the responsible party is going to be defending the price first and foremost because that is what makes their respective businesses successful.

Those anti-CMa arguments have been well polished and well played by companies who oppose CMa.... because they hold to the belief they will make more money as a GC or CM at risk.... because that is what they have been doing for decades and they don't have the skill set developed to be successful CMa's. Larger companies have fewer competitors as a GC or CMr because the arena excludes many smaller and minority owned companies who can not financially acquire the payment and performance bonds required for multi-million dollar projects. Large companies have no incentive to spend the time and money to reinvent themselves culturally only to be rewarded by finding themselves in waters filled with more sharks in it as competitors.

That said, owner's can save money with CMa due to the reduction of duplication of costs for taxes, bonds, insurance etc as well as the reassignment of risks; which actually can lead to more effective project management when handled by an adept and skilled CM. By dividing the financial liability among 30+ subs acting as prime contractors the owner can be provided better contractual protection not less. Why? Because as a CMa the CM can manage, for example, a default by a contractor without exposing themselves or their bonding company to the liability created by the default! A GC has no desire to expose inferior work or even worse a default by a subcontractor because the GC would be exposing itself to the liability as well as their own bonding company to rectifying the inferior work or default! A CMa can hold prime contractors, individually, to the standards owners rightfully expect because they have an individual contract which would be backed by an individual bond company for each individual prime contract. Any one or more of the individual bonds can be called for specific scopes of work without compromising or placing the entire project in jeopardy. In the inverse, a default by a GC involving their bond company is always going to be catastrophic for a project and is never tenable to a successful project.

As a CMa I have managed prime contractor failures and managed the completion of the work defaulted upon by working with the respective bonding company while protecting the project from failing.... AND also negotiated damages paid by the bonding company to the owner for time delays and costs created because of the default. A GC would never ask their own bonding company to pay for damages incurred by an owner because of a failed subcontract because the GC would suffer great financial loss on future bonding costs and in some cases be charged by the bonding company for much of the cost of the claim.

The key factor in the safety risk, as with the financial risk, is to have a CMa who knows how to mitigate all the risks to the owner by properly managing the contracts with the multiple prime contractors. Bonds and solid insurance policies can insure the risk remains with the prime contractors just as it would were they working as a subcontractor to a GC. The CMa has to understand the methods used to protect the owner from liability exposure just as GC's protect themselves from liability for subcontractor issues.

With CMa the CM supervises the work, holds the safety meetings and documents the safety meetings with each contractor, manages the coordination of the owner decisions, owner supplied items, architectural and engineering submittal approvals etc, just like a GC would....BUT the money goes directly from the owner to the contractors. By simply not passing the funds through a GC the liability insurance cost go down, the gross receipts taxes go to zero, accounting costs for handling money alone goes to almost zero....these items alone reduce costs by 3-4%.

For private owners I advocate that Design-Build is the superior method or project delivery, but for public projects, where public transparency is needed and small business and minority participation is desirable, I firmly believe CMa is a project delivery method which is viable for significant savings and also opens up opportunities for smaller and/or minority owned firms to participate as well.

Just because the establishment firms in an industry don't embrace innovation and change doesn't mean the innovation and change isn't well founded and deserving of exploration and trial. 

Dave Hemelright

Manager & Consultant, Facilities Maintenance, Energy & Construction

9 年

Working for a CMA on Sevier County Schools we saved the county $750K on bid opening day with the CMA process. The savings were rolled back into the project for additional work prevoiusly "valued engineered" out.

Randy Guignard

Director at Four Seasons Inc. Owner at Zenith Homes (The Preserves LLC) Project Consultant- Skilled Services

9 年

I have saved money for many public project owners by working with a CM. I would many times rather work through a CM then a GC.

要查看或添加评论,请登录

Sanford Loy CCM BArch MSCE的更多文章

  • Licensed Bonded and Insured? Really?

    Licensed Bonded and Insured? Really?

    Licensed, bonded and insured….what does that really tell you? By Sanford C Loy CCM BArch MSCE This is more important to…

  • The CCM designation… the gold standard for CM services

    The CCM designation… the gold standard for CM services

    When I first earned the Certified Construction Manager (CCM) designation from the Construction Management Association…

  • CM Agency - Facts not fiction

    CM Agency - Facts not fiction

    Construction management has been performed in a myriad of ways under just as many names. More often than not the…

  • Design-Bid-Build, Design-Build or Construction Management? Circa 2022

    Design-Bid-Build, Design-Build or Construction Management? Circa 2022

    I previously wrote about these three major project delivery systems in 2015. It proved to be my most viewed article.

    1 条评论
  • Building in 2018 and beyond

    Building in 2018 and beyond

    Every generation sees the world changing in front of their eyes. Most shake their heads in dismay and wonder what the…

  • Critical skill set for building today

    Critical skill set for building today

    With all the modern day gadgets and technology you would think that construction would have evolved into an industry…

    3 条评论
  • It's your project, your business, your money...proceed with care!

    It's your project, your business, your money...proceed with care!

    So you are looking at building a new facility or expanding your existing one..

    2 条评论
  • Everyone loses in bid games

    Everyone loses in bid games

    A trending but self-destructive practice is the increasingly often played games in the time between a project bid being…

  • Design-Bid-Build, Design-Build or Construction Management?

    Design-Bid-Build, Design-Build or Construction Management?

    Due to the confusion caused by the misperceptions of these 21st century project delivery processes and the results they…

    15 条评论
  • Renovate or build? the $MM question

    Renovate or build? the $MM question

    As facilities age and usage and programmatic needs change the million dollar question always comes up. Which is the…

    1 条评论

社区洞察

其他会员也浏览了