When are you required to Requalify a WPS?
Usually when I write an article or post it is motivated by questions usually asked by customers or clients. Regrettably, the question of “At what point do I need to requalify my WPS?” is not asked that often, but it should be. A welding procedure specification (WPS) is a set of instructions that if followed to the letter, insure a sound weld. A WPS will typically provide ranges rather than single values for some variables such as amperage, voltage, and travel speed. Nonetheless, if the values used for making a weld are outside of the parameters of the WPS, then it has been violated.
So, when should you requalify a WPS? The answer is always, when the code or specification require it. When doing code work, you should always reference the code you are working to for guidance. Most codes have similar requirements as to when requalification of a WPS is necessary. In general, any change beyond the limits of the procedure qualification record (PQR) will require requalification. If any of these variables change consult your code or specification to see if you need to requalify a WPS.
- Type of base material
- Thickness of base metal
- Joint design
- Pipe diameter
- Type of current
- Electrode size
- Electrode classification
- Welding current
- Position of welding
- Voltage
- Contact tip to work distance
- Deposition of weld metal
- Preparation of root of weld for second side welding
- Preheat and interpass temperature
- Post heat treatment
Following is an example of investigating whether requalification is necessary. ABC Company is doing work governed by the AWS D1.1, Structural Welding Code – Steel. As a cost reduction and efficiency improvement measure the company decides to make the following changes:
- Switch to .052” ER70S-6 mig wire from .045” ER70S-6 wire for higher deposition rates in some areas
- Increase amperage from 250 to 265 with .045” ER70S-6 wire to increase deposition rates in remaining areas
- Change from tapered nozzles to ?” ID coupled with increase from 40cfh to 45cfh to reduce issues with porosity.
- Switch their shielding gas mixture from 75% argon/25% CO2 to 90% argon/10%CO2 to reduce spatter and decrease grinding
- Some welds will be made vertical up to improve penetration and reduce leaks (using same parameters)
If we consider each of these changes individually here is how things would shake out. We reference AWS D1.1, Structural Welding Code – Steel – Table 4.5 – PQR Essential Variable Changes Requiring WPS Requalification for SMAW, GMAW, FCAW, and GTAW and review each change.
- Switch from .045” to .052” – Table 4.5(10) indicates that “any increase” in filler metal diameter shall require requalification.
- Amperage increase from 250 to 265 staying with .045” wire – Table 4.5(12) requires requalification if the change in amperage exceeds 10%; therefore, we do not need to requalify in this case since a 15 amp increase only represents a 6% change.
- Change in nozzle size and gas flow rate – Table 4.5 does not mention changes in nozzle size as an essential variable. However, when in doubt go to the engineer or to the customer for clarification. The change is gas flow rate is does not require requalification per Table 4.5(20). A change is only necessary if the flow rate goes up by more than 50% or is reduced by more than 20%.
It is important to consider the effects of changes here as well. A change in nozzle may not be an essential variable, but if the larger nozzle hampers access and requires the welder to run a longer contact tip to work distance this could decrease the amperage to the point which require requalification.
- Switch from 75/25 to 90/10 argon/CO2 shielding gas – Table 4.5 (19) requires a change when the gas composition is changed exceeding code limits. In this case a change of more than 10% of the minor component requires requalification.
Also, this change allows ABC to go from globular transfer into spray transfer. This is a mode of metal transfer change which also requires requalification per Table 4.5 (14).
- Addition of vertical up welds – requires qualification as well per Table 4.5 (30) which states that requalification is needed “for any pass from uphill to downhill or vice versa.”
Sound knowledge of the welding process and understanding of the code or specification involved is critical. If you don’t have this at your company give RPS Welding Consultants a call or email. We are able to provide this type of assistance. Not following code can be costly.
QMS, CWI, Safety
10 个月This brings up another question. Is there a lifespan or length of time a WPS is good for and needs requal?
General Manager Operations at Confluence International FZ LLC, Dubai UAE
2 年Thanks
Project Manager | Mechanical Engineer | MBA Candidate at Mays Business School - Texas A&M University
5 年Thanks for knowledge sharing. Great post.
TFe Connection
5 年Great stuff Randall, appreciate the knowledge.
API1169/AWS CWI/Pipe Welder
5 年You only have to use a prequalified WPS when you plan on testing welders and or trying to bid acceptance to show your company has the means to do the specific job per the job scope and quality review.