What are the Code Allowances for Podium Construction?

What are the Code Allowances for Podium Construction?

In my last newsletter, I explained the basics of podium design and the benefits it offers to developers and hoteliers. Today, I discuss what is allowed by the International Building Code (IBC) when utilizing podium construction.

What Are the Code Allowances?

The IBC limits the number of stories a building can have based on the construction type and materials being used. See the below chart for the limits of each construction type.

As you can see above, a traditional Type V (wood framed) construction is limited to 4 stories and Type III construction (FRT wood) is limited to 5 stories. If you are building a hotel utilizing either construction types, you will be limited to this.

The number one benefit of podium construction is that the IBC allows you to go higher than the limits noted above utilizing the horizontal building separation allowance (IBC 510.2). This allowance consents the building to be considered as two separate and distinct buildings for the purpose of determining the maximum number of stories, assuming certain criteria are met.

In other words, you can place a Type V or Type III building on top of a Type I building.

These criteria determine whether or not a building falls within the allowance code:

  1. The horizontal assembly that separates the buildings must have at least 3 hours of fire-resistance rating.
  2. The building below the horizontal assembly is a Type I construction.
  3. Stairway, escalator, shaft, and ramp enclosures penetrating the horizontal assembly must not have a fire-resistance rating of fewer than 2 hours.

What Has Changed Recently? 

  • Up until the 2012 IBC version, podiums were limited to only one story above grade.
  • The 2015 version of the IBC increases this limits and allows 5-over-2 podium-style construction.
  • This update lets a 5-over-2 building utilize the maximum building height of 85 feet.
  • Please note that local jurisdictions may have set their own amendments to the IBC, based on geographic factors such as seismic activity.

Interested in podium construction? Don’t hesitate to reach out to me!

 

Thank you,


Blair Hildahl

Base4 Principal

608.304.5228

[email protected]


Recently Completed Podium Design Projects by Our Team:





要查看或添加评论,请登录

Blair Hildahl, PE, LEED AP的更多文章

  • Let’s Talk About Three Hotels on One Site

    Let’s Talk About Three Hotels on One Site

    Reading Time: 3 minutes Hotel developers are looking for a way to attract new customers while cutting costs. We have…

    4 条评论
  • Is it time to start building with wood again?

    Is it time to start building with wood again?

    Reading Time: 4 minutes We have all seen the headlines! Lumber prices have dropped 50% in the last two months…

    1 条评论
  • Quieter Apartments = Higher Rents

    Quieter Apartments = Higher Rents

    Keeping The Noise Out When you live in an apartment, noise is everywhere. Noise reflects from hard surfaces, like…

  • Cold Formed Steel vs Structural Steel

    Cold Formed Steel vs Structural Steel

    Reading Time: 5 minutes We’ve recently discussed cold-formed steel and how it can be utilized with Industrialized…

    3 条评论
  • Saving Time and Money With Bathroom Pods

    Saving Time and Money With Bathroom Pods

    Reading Time: 4 minutes Offsite construction is a timely solution for multifamily developers. Last week I showed you…

    7 条评论
  • Get Your Online Masters in Modular!

    Get Your Online Masters in Modular!

    Reading Time: 3 minutes Industrialized Construction is the future. It is the only way to address the major problems in…

    1 条评论
  • Rising Housing Costs = Apartment Opportunities

    Rising Housing Costs = Apartment Opportunities

    Reading Time: 4 minutes Housing prices are skyrocketing right now, and developers have an opportunity to meet the need.…

  • Pandemic Proof Your HVAC System

    Pandemic Proof Your HVAC System

    Reading Time: 3 minutes The pandemic has shifted people’s thinking about the future, especially in building design…

  • Let’s Bend Some Metal

    Let’s Bend Some Metal

    Reading Time: 4 minutes Staying on the cutting-edge of the building market is hard, especially with the rapid onset of…

    4 条评论
  • Build Apartment Walls in a Factory

    Build Apartment Walls in a Factory

    Reading Time: 5 minutes So, you want to dive into offsite, prefabricated, and modular, but your project doesn’t seem to…

    1 条评论

社区洞察

其他会员也浏览了