Value Engineering.01

Value Engineering.01

01-Definition and concept of value engineering in the context of construction: -

A-Definition: Value engineering is a systematic and multidisciplinary approach that seeks to optimize the value of a construction project by identifying opportunities to reduce costs, enhance functionality, improve quality, and achieve project objectives more efficiently. It involves analyzing the design, materials, construction methods, and project requirements to identify alternative solutions that provide the same or improved results at a lower cost.

-????? ??????:- ?? ??? ????? ?????? ???????? ???? ??? ????? ?????? ?????? ?????? ??????? ?? ???? ????? ????? ???? ????????? ?????? ?????? ???????? ?????? ??????? ?????? ????? ??????? ?????? ????. ????? ????? ??????? ??????? ???? ?????? ???????? ??????? ?????? ?????? ??????? ???? ???? ??? ??????? ?? ??????? ?????? ???

B-Concept: The concept of value engineering acknowledges that the value of a construction project is not solely determined by its cost but also by its ability to meet the needs and expectations of stakeholders while maximizing efficiency and quality. Value engineering aims to identify and eliminate unnecessary costs, inefficiencies, and redundancies while maintaining or improving the desired functionality and performance.
????? ????? ?????? ??? ??? ????? ??????? ???? ???? ???? ?????? ??? ????? ???????? ???????? ?? ??????? ???????? ???????? ????? ??? ??? ???? ?????? ?????? ???????? ???????? ???? ??? ????

C-Value engineering is typically conducted during the design phase of a construction project, although it can be applied at any stage of the project lifecycle. It involves collaboration among different stakeholders, including designers, engineers, contractors, and owners, to explore innovative ideas, challenge assumptions, and develop cost-saving solutions that deliver optimal value.

????? ?????? ???? ??????? ??? ???? ????? ???????

D-The primary focus of value engineering is to balance cost, performance, and quality by examining the project from multiple perspectives, challenging traditional approaches, and seeking alternative solutions. It requires a thorough understanding of project requirements, a creative mindset, and a commitment to continuous improvement.

??????? ??????? ?????? ?????? ??? ????? ??????? ??? ??????? ??????? ??????? ?? ???? ??? ??????? ?? ????? ??? ??????? ????? ????? ?????????? ?????? ?? ???? ?????

-Value Engineering Vs Cost Reduction Vs Cost Cutting with Practical Examples check attached Link         

https://www.dhirubhai.net/feed/update/urn:li:activity:7079062508501635072?updateEntityUrn=urn%3Ali%3Afs_updateV2%3A%28urn%3Ali%3Aactivity%3A7079062508501635072%2CFEED_DETAIL%2CEMPTY%2CDEFAULT%2Cfalse%29&originTrackingId=4VwQJmjnRy%2BC%2Bid%2FlG%2FccA%3D%3D&lipi=urn%3Ali%3Apage%3Ad_flagship3_profile_view_base_recent_activity_content_view%3BAQAZREQcTR%2BXTSYB9fWxUQ%3D%3D


02- Goals and objectives of value engineering: -???????

  1. Cost Reduction: One of the primary goals of value engineering is to identify and eliminate unnecessary costs within a construction project. By analyzing the design, materials, and construction methods, value engineering aims to find alternative solutions that provide the same or improved functionality at a lower cost. The objective is to achieve cost savings without compromising the quality, performance, or safety of the project.

????? ???? ????? ???? ??? ??????? ?? ?????? ?????? ???. ????? ?? ????? ?????? ?? ???????? ??? ?????? ????? ??????? ?? ????? ?? ??????

  1. Functionality and Performance Enhancement: Value engineering seeks to enhance the functionality and performance of a construction project. By examining the project requirements and exploring alternative solutions, it aims to identify opportunities for improving the efficiency, effectiveness, and usability of the project. The objective is to deliver a final product that better meets the needs and expectations of the stakeholders.

????? ????? ??????? ?????? ????? ??????? ???????? ???????? ?????????. ????? ?? ????? ???? ????? ???? ???? ???? ???????? ??????? ????? ???????

  1. Quality Improvement: Value engineering places a strong emphasis on improving the quality of the construction project. By evaluating the design, materials, and construction methods, it aims to identify ways to enhance the durability, reliability, and overall quality of the project. The objective is to deliver a high-quality end result that meets or exceeds industry standards and satisfies the project requirements.

????? ????? ?????? ????? ?????? ???? ?? ?????? ?????? ??????? ????? ??????? ???????.

  1. Optimization of Resources: Value engineering aims to optimize the use of resources in a construction project. This includes materials, labor, equipment, time, and other resources. By analyzing the project components and processes, it seeks to identify opportunities for resource allocation that can increase efficiency and reduce waste. The objective is to maximize the utilization of resources to achieve project objectives in the most cost-effective manner.

????????? ?????? ?? ??????? ?????? ????? ???????? ????? ????? ?????? ?? ??? ???????.

  1. Stakeholder Satisfaction: Value engineering recognizes the importance of satisfying the needs and expectations of stakeholders involved in the construction project. By optimizing costs, enhancing functionality, and improving quality, it aims to increase stakeholder satisfaction. The objective is to deliver a project that meets the requirements and preferences of the owner, end-users, and other stakeholders involved.

??????? ??? ????? ???? ???? ?????? ?????????

  1. Innovation and Creativity: Value engineering encourages innovative and creative thinking in the construction process. By challenging traditional approaches and exploring alternative solutions, it aims to foster innovation and promote out-of-the-box ideas. The objective is to bring fresh perspectives and creative problem-solving to the project, leading to more efficient and effective outcomes.

???? ??????? ??????? ????? ???? ?????? ???????? ??? ???? ??? ????? ???? ????? ???????.

03-Finally, the overarching goal of value engineering is to maximize the value delivered by a construction project. This is achieved by identifying cost-saving opportunities, enhancing functionality, improving quality, optimizing resource allocation, and ensuring stakeholder satisfaction. The objectives of value engineering align with the broader goals of achieving project success, managing costs, and delivering high-quality construction projects.

????? ????? ????? ?????? ?????? ?? ????? ?????? ???? ?????? ????? ?????? ??? ???? ??. ?????? ??? ?? ???? ????? ??? ???????? ?? ????????? ?????? ?????? ???????? ?????? ??????? ???????? ?????? ???????? ????? ??? ????? ???????. ?????? ????? ????? ?????? ?? ??????? ?????? ???????? ?? ????? ???? ??????? ?????? ???????? ?????? ?????? ?????? ????? ??????.

...........................................will be continue next posts.

Thanks,

by Mohamed Rashad

要查看或添加评论,请登录

Mohamed Rashad的更多文章

  • Value Engineering.09 Process

    Value Engineering.09 Process

    07-Monitoring and evaluation (M&E) Monitoring and evaluation (M&E) play a crucial role in the value engineering process…

    2 条评论
  • Value Engineering.08 Process

    Value Engineering.08 Process

    06-Implementation Implementation in the construction value engineering process refers to the practical application of…

  • Value Engineering.07 Process

    Value Engineering.07 Process

    05-Development and Presentation Development 05.1-Development Development is the initial phase of the value engineering…

    1 条评论
  • Value Engineering.06 Process

    Value Engineering.06 Process

    04-Evaluation and selection Evaluation and selection are crucial steps in the value engineering process in the…

  • Value Engineering.05 Process

    Value Engineering.05 Process

    03-Idea generation Idea generation is an essential part of the value engineering process in the construction field. It…

    1 条评论
  • Value Engineering.04 Process

    Value Engineering.04 Process

    02-Analysis and evaluation the analysis and evaluation process in construction value engineering is a systematic…

  • Value Engineering.03-Process

    Value Engineering.03-Process

    01-Information Gathering Information gathering is a crucial step in the process. It involves collecting and analyzing…

  • Value Engineering.02

    Value Engineering.02

    (Importance & Process) A-Importance of value engineering in optimizing project costs and enhancing value: - Cost…

社区洞察

其他会员也浏览了