Understanding PRC-028-1: Disturbance Monitoring and Reporting Requirements for Inverter-Based Resources

Understanding PRC-028-1: Disturbance Monitoring and Reporting Requirements for Inverter-Based Resources

The U.S. energy landscape is rapidly evolving with the increasing integration of renewable energy sources. In particular, the widespread adoption of inverter-based resources (IBRs), such as wind turbines and solar photovoltaic (PV) systems, has brought about a transformative shift in the generation and distribution of power.

As traditional fossil fuel-based power generation gives way to cleaner and more sustainable options, IBRs have emerged as key players in achieving energy transition goals. However, integrating IBRs into the power grid presents unique challenges, particularly in maintaining grid stability during disturbances. As the North American Electric Reliability Corporation's PRC standards play a vital role in maintaining the electric grid's reliability, a new standard, PRC-028-1, has been introduced.

The new PRC-028-1 standard helps guide the further integration of IBRs into the Bulk Power System. This white paper aims to provide a comprehensive exploration of the standard, delving into its key aspects, so Transmission Owners and Generator Owners can continue to contribute to the reliability, security, and resilience of the U.S. electric power system.

Download our white paper to understand the key aspects of the PRC-028-1 standard and discover how Certrec can assist you in achieving compliance.

要查看或添加评论,请登录

社区洞察

其他会员也浏览了