Two stuck pigs in a pipeline!
When it’s been two and half years since shut down and you have two stuck pigs in a pipeline that spans more than 300 kilometres – you’re facing a really serious challenge. This was the work brief presented to Nexxis recently by a client.
Fortunately, the client estimated that blockages (pigs) were located in a 1.2km span of spool, approximately 43km’s into the pipeline.
Read the full case study: Click this link!