The Government’s commitment to zero emissions by 2050 sets a huge challenge to the construction sector and one that we all need to embrace if we are to help address the climate crisis. The Committee on Climate Change proposes eradicating burning of fossil fuel in all new buildings by 2025 and the latest Intergovernmental Panel on Climate Change (IPCC) report concludes that “New construction [has] to be fossil-free and near-zero energy by 2020”.[1]

Designing and constructing new buildings provides a one-off opportunity to create truly net zero carbon and energy buildings, meaning that we have to balance the net demand with renewable energy generation. This is a tough ask, but it has been done, albeit mainly for buildings that have relatively low energy intensity and plot density. To achieve net zero in energy intensive buildings on constrained sites, we have to do the obvious stuff like driving down energy demand, using on-site renewable generation and switching to electric solutions, but we also have to cross some red lines:

  • Firstly, the red line boundary around the site will have to be straddled: it is unlikely that sufficient energy can be generated on site to offset the energy demand of the building, so there will have to be some contribution from beyond the site boundary.
  • Secondly, the landlord / tenant divide will have to be erased: the occupants drive the energy demand of the building, while the landlord owns and operates the central plant.
  • Thirdly, the line between construction and operation needs to be bridged so that operational performance matches the ambitious targets set at the design stage. All too often, the design intent is not being delivered in the operational performance of our buildings.

Developers are, understandably, reluctant to look beyond the site boundary for a new development as this has the potential to add costs, risks, delays and/or contractual issues to the project. This has already changed in London with the London Plan’s energy hierarchy that requires developers to investigate sources of ‘secondary heat’, such as sewage heat recovery, canals, rivers, and district heating systems. The net zero ambition will drive developers and building owners to find places where they can install photovoltaics on neighbouring buildings or other parts of their portfolio and start to produce energy as well as consuming it – becoming ‘prosumers’. This would allow constrained, energy intensive buildings to glean renewable energy from lower intensity buildings with large roof areas (industrial buildings, stations, etc.) to help them towards net zero.

The landlord / tenant divide can be bridged with co-operation and enabled with technology. Smart meters and intelligent BMS can: integrate different building control systems (such as landlord and tenant’s BMS); provide data to both landlord and tenant to inform behaviour change; and enable demand management to turn off equipment when it is not needed.

The differences between design intent and operational performance can be reconciled by using 'digital twins' to provide better estimates of operational performance at the design stage and help to understand how the building should be performing in operation. And there are lessons to be learned from the way that Passivhaus projects are delivering impressive performance by setting ambitious targets and applying a high level of scrutiny to every detail.

The road to net zero buildings requires us to cross both physical and contractual boundaries that have long hampered our ability to deliver low energy, low carbon building. We can only achieve net zero in our densely populated buildings on constrained sites by breaking down these boundaries and using disruptive technologies to dissolve the lines we have drawn.

[1] https://www.ipcc.ch/sr15/



A.P Gooch Basement Waterproofing Ltd

Basement Waterproofing Specialists - Designers & Installers

5 年
回复
Brian C Scott

Sustainability Advocate | PACE Champion | Speaker | Motivator | Co-op Consultant

5 年

Dave Cheshire Well thought out article which examines and challenges the systemic barriers to a wholistic approach to sustainable design and construction. It needs one more piece to be complete however. How do we accelerate adoption when the financial barriers are seemingly still ever present. The answer is found in an innovative financing tool that is proven to eliminate both the capital barrier and the transferability risk barrier. I am speaking of #PACEfinancing. I recommend you familiarize yourself with it. There are two excellent articles in the documents section of my profile and of course, the following websites: bit.ly/EuroPACE bit.ly/paceUSA bit.ly/paceCAN Richard Thaler (father of behavioural economics) has observed “if you want a behaviour, make it easy”. PACE makes it easy because it makes economic and business sense.

Paul Dowsett

Principal Architect at Sustainable | Architecture for a Healthy Planet.

5 年

Hi Dave, great article! Would you mind if we featured this on our blog?

noel brady

Team Leader I Innovator I Designer I Educator I Author

5 年

We must wake up to the eco-footprint we leave behind. At least we are beginning to acknowledge just how big that is. Aside from the offsetting redline issues which requires a much more sophisticated systems design approach it should dawn on us that we need to live close to work with communities next to services. A more complex mixed use future beckons.

要查看或添加评论,请登录

Dave Cheshire的更多文章

  • Plants in the plant room? Designing regenerative buildings that metabolise

    Plants in the plant room? Designing regenerative buildings that metabolise

    Imagine if, instead of grey metal boxes consuming energy, our buildings were serviced by plants and natural processes…

    10 条评论
  • Regenerative buildings - a New Year reading list?

    Regenerative buildings - a New Year reading list?

    If your New Year resolution is to learn more about regenerative design, then the photo above shows the thirty books…

    27 条评论
  • Can we give nature a voice in decision making?

    Can we give nature a voice in decision making?

    It’s amazing to think that there is one critical infrastructure system that is not considered in decision making, yet…

    4 条评论
  • Is regenerative the new sustainable?

    Is regenerative the new sustainable?

    With Architect’s Declare publishing a Primer, IStructE publishing a new book, and with the launch of the Regenerative…

    6 条评论
  • Are we looking at the future of net zero carbon?

    Are we looking at the future of net zero carbon?

    I chaired an event on Tuesday at AECOM’s London office with four speakers who shared their thoughts on the forthcoming…

    1 条评论
  • GLA publishes final Whole Life Carbon and Circular Economy guidance

    GLA publishes final Whole Life Carbon and Circular Economy guidance

    By: Aspa Skorletou and Dave Cheshire The GLA’s ground-breaking whole life carbon and circular economy policies are…

    23 条评论
  • Back to the Future Office

    Back to the Future Office

    The combined impact of the Corona Virus and the climate crisis is already making us re-think property and workplace…

    2 条评论
  • Circular buildings and DfMA(D)

    Circular buildings and DfMA(D)

    Design for manufacture and assembly (DfMA) is transforming our industry and it has the potential to be more sustainable…

    5 条评论
  • Net zero buildings and the rise of the 'prosumer'

    Net zero buildings and the rise of the 'prosumer'

    Radically reducing emissions from buildings has become an urgent priority for the construction industry. At AECOM’s…

    2 条评论
  • Circular economy buildings - saving capital costs

    Circular economy buildings - saving capital costs

    Applying circular economy design principles to your building should increase its value over its life. Circular…

    1 条评论

社区洞察

其他会员也浏览了