Traffic Impact Assessment for a New Development

Traffic Impact Assessment for a New Development

Traffic Impact Assessment (TIA) is a systematic process undertaken to understand the impact of a new development on the existing transportation network. It evaluates how a proposed development will affect the surrounding road system and what improvements might be necessary to accommodate the increased traffic demand. The process typically involves several key steps, which are briefly explained below:?

  1. Scoping and Study Area Determination: The first step is to define the scope of the TIA and identify the study area. This involves understanding the scale of the development, the expected increase in traffic, and the geographical area that might be affected.
  2. Data Collection: This involves gathering existing traffic, road network, and accident data. It also includes collecting data on the proposed development such as the type and size of the development, expected growth, and any planned transportation facilities.
  3. Trip Generation and Distribution: This step estimates the number of trips that will be generated by the new development. The Institute of Transportation Engineers (ITE) publishes trip generation rates for different types of developments which are commonly used for this purpose. Then, it determines how these trips will be distributed across the road network.
  4. Traffic Assignment: This step involves assigning the projected trips to the existing road network to predict future traffic volumes on roads and intersections around the development.
  5. Capacity Analysis and Level of Service (LOS) Evaluation: Using software tools like Synchro, VISSIM, or HCS, the future traffic volumes are analysed to assess the operation of roads and intersections. This analysis determines the Level of Service (LOS), which is a qualitative measure describing operational conditions within a traffic stream, and their acceptability.
  6. Impact Identification: This involves identifying the impacts of the projected traffic on the road network, including any potential congestion, safety issues, or degradation in LOS.
  7. Mitigation Measures: Based on the identified impacts, this step recommends measures to mitigate negative effects. This could include road improvements, traffic signal adjustments, the introduction of new public transportation services, or the implementation of travel demand management strategies.
  8. Report Preparation and Submission: The findings, including the methodology, analysis, impacts, and recommended mitigation measures, are compiled into a report. This report is then submitted to the relevant authorities for review.
  9. Review Process: The submitted TIA is reviewed by the local transportation or planning authority. They may request further information, suggest additional analyses, or recommend changes to the proposed mitigation measures.
  10. Public Consultation: Often, there will be a process of public consultation, where stakeholders, including the general public, have the opportunity to provide feedback on the proposed development and its anticipated traffic impacts.
  11. Approval and Implementation: If the TIA is approved, the development can proceed, often with conditions requiring the implementation of the identified mitigation measures.

Throughout this process, collaboration between developers, transportation planners, local authorities, and the public is crucial to ensure that the development is compatible with the existing transportation infrastructure and community needs.