Trade fair EPF 2023: discover all KLB  product innovations live and in colour
KLB at the EPF 2023 in Feuchtwangen, Germany

Trade fair EPF 2023: discover all KLB product innovations live and in colour

No picture or video can replace the feeling of seeing products live. Especially when it comes to new developments!

If you were not yet able to hold our samples in your hands at BAU 2023 in Munich, it is best to get an impression of our innovations at the next trade fair, which will be the EPF 2023 – international exhibition for screed, parquet and tiles in Feuchtwangen:

  • Exhibition Tent 1, Stand D6
  • 22 to 24 June 2023
  • Feuchtwangen, GERMANY

Visit us at the stand! You can find the opening hours of the fair, directions and other important information in the current news article on our website.



You can look forward to the following products, and much more:

Permeable, statically crack-bridging system K7 KLB PARKING EP OS 8 Flex

Es wurde kein Alt-Text für dieses Bild angegeben.

Surface protection systems are primarily intended to protect the building structure from chemical or mechanical influences. Our newly developed system K7 KLB PARKING EP OS 8 Flex meets this challenge when used in interior areas where static crack bridging is required, e.g. on spindles and ramps. Moisture in the substrate can escape through the water vapour-permeable layer.?

What special requirements do you have for the surface protection system in your car park project? Here you can find a direct comparison of all KLB PARKING systems.



Industrial grouting with the KLB power combo!

The combination of our primer PU 68 Rapid U and the elastic grouting compound PU 466 is the ideal solution for low-odour grouting of accessible movement and connection joints in industrial or storage halls, as well as in other areas that are subject to high loads.

With their extremely fast hardening and rapid usability, the products serve in the same way as primer, binding agent for reprofiling, and grouting resin, which makes them particularly suitable for both renovations and new constructions.?

These are your advantages:?

?? very short installation time

?? fast-curing

?? highly elastic and deformable

?? noise and vibration damping

?? joint can be driven over smoothly

?? 24 hours until mechanical load, 36 hours until chemical load

Have a look at the news article and get convinced!

要查看或添加评论,请登录

KLB Koetztal International的更多文章

社区洞察

其他会员也浏览了