Thanks for the Great Time
Control/break/bathroom building built offline and lifted into place g

Thanks for the Great Time

Due to family health issues I unfortunately was not able to travel enough required to make the Harrigan project successful. It was the hardest decision of my career but Family first and a successful project a very close second. I would like to thank all of the Harrigan Team and the great local contactors (Hammer, Wiggins, Burkes, R&R) for letting the crazy Canuck into their Southern Alabaman lives for the last 2 1/2 years. Shout out to EnDeCo Construction, ARE and EMI (Electrical installers) who made a PM's life easy. We all came together as a team and thought outside of the box to minimize the shutdowns. We have found an amazing PM replacement, Mike Richard formally of the Sinclair Group. He will fulfill all expectations and make this project successful through the finish line. Sorry Mike for pulling you out of retirement!

On a positive note, I would like to announce that I have joined the Springer USA Team as North American Project Manager to let me balance life and work. What an amazing company with a product line that sells itself. Gap control anyone?? Looking forward to finishing out my career with this great team.

Thanks for everyone's understanding, Mark

Jon Bowlin

President at EnDeCo Engineers, Inc

2 年

congrats Mark

回复

要查看或添加评论,请登录

社区洞察

其他会员也浏览了