Test for KHD Germany module 39 open pinion

Test for KHD Germany module 39 open pinion

Module 39 open pinion signed between CITIC IC Luoyang Heavy Machinery Co., Ltd. and KHD Germany. After two and a half months of production, with the condition of after the final processing completed, the final inspection of the pinion was carried out according to the ITP inspection requirements. CIC cooperated with the quality director of KHD China to conduct the final inspection of the pinion. The test results fully meet Humboldt requirements.

图片无替代文字
图片无替代文字
图片无替代文字
图片无替代文字

要查看或添加评论,请登录

Citic Ic Luoyang Heavy Machinery Co.,Ltd.的更多文章

社区洞察

其他会员也浏览了