Successful Shutdown Achievement
SubC was in 2022 awarded a long-term, ???????????? ?????????????????????? ????????????????? (FMC) with our customer ALTRAD .
The FMC has been active for eight months now, and in this phase, we are focusing on preparing and maturing projects for offshore execution within Mechanical and Electrical fields. One of our ongoing campaigns is the yearly Vessel Campaign that takes place from a modern W2W Vessel.?
The vessel was recently located at the Halfdan A platform where it was taking part in the activities during the Shutdown of the platform.
A shutdown for which we were praised by TotalEnergies as we managed to finish within the scheduled timeframe, despite a 3-day delay in port due to adverse weather conditions.
Alongside the campaign project, we have our "FMC Baseline Team" who is responsible for managing the routine maintenance tasks that require execution offshore.
These tasks include activities such as the replacement of corroded handrails and the fabrication and installation of new pipes that have developed leaks.
Maintenance of offshore facilities is crucial to ensure operational reliability and optimal performance. Our team works diligently to identify and address arising issues, performing necessary repairs and replacements. This not only ensures a safe workplace for the offshore personnel but also facilitates a continuous and reliable offshore energy production.
SATURATION DIVER / ALST / DMT / WELDER / BURNER /
1 年Just curious, as to whom I would could contact (name, phone, email address, etc. re: sending my C.V. Thanks.
OIM Torpille
1 年Well done again!
Bridging the Gap Between Engineering & Management | Technical Writer & Project Manager | Founder @ CH?CK Consultancy | Co-Founder @ The Female Connection
1 年Well done! Thanks for your contineous efforts despite all the hurdles we faced.. ????
Process Engineer: Delivering Excellence in Functional Specifications and Commissioning While Adhering to QHSSE Policies.
1 年Congratulations to all for your excellent work! This achievement was possible because of your hard work and determination. You all deserve the recognition! Great to be part of this project.
Rope Access stage 3 Rigger | Irata level 2
1 年Neil mitchell Blair Watson