Subsea contracts awarded for Barossa gas project offshore Australia

Subsea contracts awarded for Barossa gas project offshore Australia

ADELAIDE, Australia – ConocoPhillips has awarded the main outstanding contracts for the subsea infrastructure for the Barossa project, 300 km (186 mi) north of Darwin, northern Australia, in the NT/RL5 petroleum permit.

According to partner Santos, these are the last major facilities commitments ahead of a final investment decision (FID), expected in 2Q 2020.

Subsea 7 will transport, install and pre-commission 36 km (22 mi) of in-field flowlines, along with the subsea umbilicals and risers, in water depths of 230-270 m (754-886 ft).

The company expects to execute the offshore campaign during 2022-23, using various reel-lay and heavy construction vessels.

Aker Solutions will provide the umbilicals and National Oilwell Varco Denmark the flexible risers.

According to Santos managing director and CEO Kevin Gallagher, the contract for drilling of the production wells should also follow shortly.

Barossa will be developed via an FPSO, six subsea production wells, in-field facilities and a gas export pipeline tied into the Bayu-Undan to Darwin pipeline system that supplies gas to Darwin LNG.

Santos holds a 25% interest in the Barossa joint venture along with partners ConocoPhillips (37.5% and operator) and SK E&S (37.5%). Santos is also a joint venture partner in Darwin LNG with an 11.5% interest.

Last October, Santos agreed to acquire ConocoPhillips’ Northern Australia and Timor-Leste portfolio including its interests in Darwin LNG, Bayu-Undan and Barossa.

Once the transaction is completed, Santos plans to sell down equity in Barossa to 40-50% in order to achieve increased partner alignment.

要查看或添加评论,请登录

Shahab Akhtar的更多文章

  • 5 keys to the successful remediation of sustained annular pressure

    5 keys to the successful remediation of sustained annular pressure

    As developed wells continue to produce, these completed assets undergo thermodynamic cycling consistent with the…

  • How will the oil and gas industry use ChatGPT?

    How will the oil and gas industry use ChatGPT?

    How will the oil and gas industry use ChatGPT? It’s no secret that the so-called tentacles of ChatGPT — the natural…

  • Hot Tapping / Valve Drilling / Cutting Services

    Hot Tapping / Valve Drilling / Cutting Services

    Hot Tap: Controlled Entry into Area with Trapped Pressure As a faster and more economical approach, hot tapping allows…

  • Well integrity surveillance program

    Well integrity surveillance program

    The well integrity surveillance program is a mechanism applied to oil, gas and water production/injection wells to…

  • Weir introduces new lock-ring wellhead

    Weir introduces new lock-ring wellhead

    Weir introduces new lock-ring wellhead Weir Oil & Gas announced the launch of an updated, field-proven Unitized?…

    4 条评论
  • PROPER GASKET INSTALLATION

    PROPER GASKET INSTALLATION

    PROPER GASKET INSTALLATION AND CORRECT BOLTING PATTERNS INSURE A SATISFACTORY SEAL Center the gasket on the flange…

  • O-RING,ELASTOMER SHELF LIFE ARP5316D

    O-RING,ELASTOMER SHELF LIFE ARP5316D

    O-ring shelf life is the amount of 'storage life' generally understood as the maximum time (beginning with manufacture…

  • Leave a good impression when leaving work

    Leave a good impression when leaving work

    Good job transfer, goodbye and thanks to everyone is a good way to make a good impression when you quit your job.

    1 条评论
  • Management of isolation

    Management of isolation

    SHAHAB AKHTAR Wellhead Specialist Management of isolation s Basic principles The requirements for risk management are…

  • Maintenance Audit

    Maintenance Audit

    You Do a Maintenance Audit to reveal all the vital information you need to map a sure path to great maintenance…

社区洞察

其他会员也浏览了