A standard method statement for the installation of EPDM rubber flooring
GPCP - EPDM Rubber Flooring | Design & Build
Incorporated in Vietnam | EPDM Rubber Flooring | Design & Build | Safety-Quality-Aesthetics are our top priorities
It has been two years since GPCP Construction successfully handed over the EPDM rubber floor to the prominent general contractor Ricons at The River Thu Thiem, developed by the joint venture of REFICO and CII.
Disclaimer:
This article is a part of our method statement for installing EPDM rubber flooring for this specific residential project, and each project has its own method statement.
Site preparation.
The concrete surface used for the EPDM installation must be clean and free from dust, oil, and particles. All inhibited substances must be completely removed, such as dirt, cement, oil, hardeners, loose components, paint, etc.
The EPDM flooring construction area must have an effective drainage system.
Drainage Rule: Water permeates EPDM flooring, reaches the concrete layer, and then starts draining into grates, funnels, etc.
Safety first.
Stretch safety warning wires and stick information boards at construction areas.
Installation instructions.
领英推荐
Protection after installation.
Ensure the construction area is strictly protected from heavy rain and irrelevant people after completion, within 3 hours at least.
With perfect cooperation between in-charge people, the safety floor can last over 10 years with little maintenance.
Sharing is caring
Our personnel make us stand out.
Dive into the world of safety flooring by reading useful articles below.
(ENG, 2 min) A few major issues might occur during the installation of EPDM rubber flooring.
(ENG, 1 min) Drainage systems play an important role in the EPDM rubber floor installation work.
(VIE, 2 min) Where can EPDM rubber flooring be applied? The comparison of EPDM with other types of safety flooring.
GPCP CONSTRUCTION
Head office: 108 Tran Dinh Xu, Nguyen Cu Trinh Ward, District 1, Ho Chi Minh City
Hotline: 037 371 7728 | 0968 116447
Email: [email protected]