Business Case:

The Load Dispatch Centre is responsible for ensuring integrated operation of the power system in the western region of India which includes the states of Gujarat, Maharashtra, Madhya Pradesh, Chhattisgarh, Goa, and the union territories of Daman and Diu, Dadra, and Nagar Haveli. It covers 951,000 sq km and serves a population of 273 million – more than 30% of the area and population of the country. With the opening up of the Indian power sector, the western region witnessed rapid growth characterized by vast capacity additions through the rollout of independent power plants and ultra-mega power plants and increased open access transactions across regions. As a result, several substations were established in the western region to transmit the generated power leading to complexities in the network. The spread and scale of the network adversely impacted visibility and effective monitoring of the system which could potentially result in power outages and other cascading effects. LDC also lacked a system to trigger alarms warning of adverse events such as large-scale blackouts and cascading effects. Real-time situational awareness of the grid is key to ensuring the reliability of the power supply and preventing outages. Hence, LDC decided to implement a wide-area monitoring system (WAMS) to handle the growing scale and complexities of its network, monitor the electric grid, and prevent adverse impact caused by system instabilities

To summarize, the utility faced the following challenges:

  • Increase in scale of operations due to the emergence of Ultra Mega Power Projects (UMPPs) and Independent Power Producers (IPPs) in the region
  • Growing network complexities due to growth in the number of substations
  • Lack of an early warning system for adverse conditions
  • Lack of real-time situational awareness of the electric grid.

?The LDC invited tenders from solution providers with expertise in building WAMS. The ideal solution demanded proficiency in communication and automation as well as system integration and operation. With a cost-effective solution that was successfully implemented on a trial basis for the Southern Regional Load Dispatch Centre, Kalkitech emerged as the winner in the tender review process

The Solution:

Kalkitech’s solution included both products and professional services including:

  • Deployment of Kalkitech SYNC 4000 Control Center Front End deployed as a wide-area monitoring front end and Phasor Data Concentrator (PDC)
  • Supply and installation of Phasor Measurement Units (PMUs) along with the GPS
  • Installation of Suitable Historian Software
  • Visualization tools included an oscillation monitoring system, event analysis engine, and damping monitor engine.

?Kalkitech deployed an end-to-end WAMS solution spanning site survey, planning, design, engineering, manufacturing/integration, and testing for the LDC. It also included a general user interface for real-time situational awareness and advanced applications for wide-area monitoring. PMUs based on the IEEE C37.118 protocol were sourced from a third-party vendor and installed at strategic locations across various states, along with GPS systems. Kalkitech installed its high-performance scalable SYNC 4000 PDC and protocol conversion gateway at the LDC control center to acquire data from up to 14 PMUs in real-time. Using the Historian, Kalkitech enabled the collection and archival of PMU data and integrated the visualization system with the online Historian environment. The western region PDC was integrated with the northern region PDC for effective grid monitoring. The user interface provides a 360-degree view of the electric grid, allows monitoring of voltage differences and frequency instability, and helps identify regions that may be operating under stressed conditions. This helped LDC proactively initiate action to prevent outages. Real-time wide-area measurements from PMUs provide the oscillation monitoring system (OMS) with timely identification of oscillation events that trigger alarms when deviations from normal operating conditions are detected. The OMS framework included an event analysis engine and a damping monitor engine. The event analysis engine monitors system events in real-time. The damping monitor engine of OMS analyses ambient PMU data scans the system and provides timely warnings when the system is operating at the brim of small-signal instability.

Key Benefits:

With Kalkitech’s solution the WRDC realized multiple benefits:

  • Efficient and standards-based data collection from PMUs for real-time situational awareness.
  • Timely analysis of PMU data for critical insight on grid stability and to help prevent blackouts and cascading effects.
  • Preventive analysis of grid variations in real-time resulting in quick identification and resolution of issues.
  • Enabled emergency control through real-time monitoring of system events.
  • Increased equipment life through better grid stability.
  • Improved ability to monitor the grid across the region which could potentially prevent blackouts and adverse impact on the economy.

Complete Success Story Series:

SS1:?National Level Configuration Management & Fault Analysis System for Major Indian Utility –?Article?-?Webinar

SS2:?IEC 61850 Upgrade Cards for transformer monitoring systems for OEMs in Europe & NA –?Article?-?Webinar

SS3:?Ensuring 29% of Energy saving for International Telecom service provider by using Energy Management modules in Kalki.io –?Article??-?Webinar

SS4:?Design, Simulate and Validate IEC61850 SS for Major Australian Transmission Utility– Article?-?Webinar

SS5:?Monitoring & Controlling of Western European Windfarms from Distribution Centre using SYNC2100 - –?Article?-?Webinar

SS6: Ensuring autonomy of the Microgrid assets using Protocol Specific RBAC for Major Utility in the Asia Pacific?[DNP3 SA V5 / IEC60870-5-7] –?Article-?Webinar

SS7: Predicting Real-time fault location for radial networks in Europe using SYNC Zloop Analytics–?Article?-?Webinar

SS8:?Enabling Interoperability in Global Meter by incorporating DLMS-COSEM Protocol -?Article

SS9: Eltrix based Energy Billing and Settlement System for Major Power Plant in ME - Article

SS10: Enabling communication between multiple control centers for major transmission utility in Europe via ICCP – Article

SS11: Test Jig for Global RF communication modules used in Smart Grids - Article

SS12: Grid Metering for State Transmission Company in North India – Article

SS13: US Utility migration from old SCADA having 16K+ connections, after ensuring complete cut-over testing using ASE2000 simulator - Article

SS14: Monitoring of Bulk Water Storage and Supply System– Article

SS15: Regional Wide Area Monitoring Solution for providing Real-Time Situational Awareness – Article

SS16: Automatic generation of IEC 61850 Engineering files (SCD) for the European Utility using custom Engineering DB & defined rules – Article

SS17: Integration of multiple Solar / DER Sites to the control center of major US Utility, using IEEE 2020.5 protocol - ?Article

SS18: Setting up SCADA / Automation Lab for major Indian utility, addressing key use-cases of Evaluation, Engineering, Testing?and Security?- Article

SS19: Protection Data Collection & Analysis System (PDCAS) for the transmission system interconnected with the European Grid - Article

SS20: Enabling OEM Alarm annunciator with all the IEC 61850 use-cases, by directly plugging SYNC2XX boards - Article

要查看或添加评论,请登录

Fahid Kooloth的更多文章

社区洞察

其他会员也浏览了