SS11: Test Jig for Global RF communication modules used in Smart Grid

SS11: Test Jig for Global RF communication modules used in Smart Grid

Project Title: Test Jig for Global RF communication modules used in Smart Grid

Customer: Global RF module provider for the smart grid and other applications

Industry: Internet of things

Business Case:

The company empowers the energy and industrial internet of things industries with the only purpose-built wireless communications platform that enables utilities and cities to securely and reliably deploy any application - on one powerful network. With the most field-proven,?globally compliant solution in the market,?they empower you by connecting the world of things?.

The specific use case for the customer was to have an automated test jig specifically developed for verifying the proper adaptation of their RF communication modules. The OSDI modules were?SOM?(System?On?Module)?based solutions for integrating meters into the?RF?network.?Meter vendors were expected to adopt the?NIC?reference design into their meter interface boards.?The manufactured meter boards were required to undergo a rigorous test to verify that electronic,?electric, and radio interfaces were properly integrated and were good to be shipped to the customer. The RF manufacturer had developed a?test plan specific to this.?The specific use case was to develop the automated test jig that performs all these tests automatically and provides a Go/No Go verdict for each of the devices being tested.

Key Design Features considered:

1.Increase productivity - Meter communication cards were produced in lots and the performance of the jig should be in line with the manufacturing process.

2.Custom development required - Since the meter implementation varies from vendor to vendor, the test jig must be custom-built.

3.Accuracy of results?-?Test jig should take accurate and precise measurements to meet the specific test requirement that includes voltage,?current,?rise time,?ramp rate thresholds.?The intrinsic delays and errors should be negligible in magnitude.

4.Decreased human interaction?–?Minimal human involvement in executing/interpreting test results.

5.Increased traceability – Maintaining detailed logs and report for the test conducted. This will help to conduct root cause analysis.

The Solution:

The solution provided by the Kalkitech hardware and software services team included the following components

  • Barcode scanner enabled reduction of delay and errors while setting up the unit avoiding the manual entry of OSDI and PCB Serial Numbers.
  • Data acquisition and control cards to control, capture and coordinate the test devices and sequence.
  • Mechanical design made to brace the DUT to jig effortlessly without mounting errors.
  • Custom Test Manager application that was used for the complete vendor tests and can also be customized to specific user requirements.
  • A user-friendly reporting engine was provided for generating reports for the tests performed.

Key Benefits:

  • The test jig system was able to conduct all the tests specified in the customer test requirements (that was customized for a specific meter partner).
  • The system was integrated into the manufacturing setup and necessary training was imparted to the technical team.
  • The reporting interface provided key test details with status. Individual and Summary report selection. Interfaces to extract management information like daily /weekly production report with date selection including test count etc.
  • Unattended test execution and result generation. One full set of tests (including RF test completed in ~60 Sec).
  • Easy input interfaces including barcode scanner for faster testing
  • Optional error code sticker printer to enable easy debugging.

Note:?Kalkitech provided hardware and software consultancy services in several areas including protocol consulting, integration support, customization, and testing inclusive of certification. This also included hardware areas of design, meeting EMI/EMC requirements as per IEC61850-3 standards, development of test jigs, SOC integration for PRP/HSR/PTP, and other network requirements, etc.

?Complete Success Story Series:

SS1:?National Level Configuration Management & Fault Analysis System for Major Indian Utility –?Article?-?Webinar

SS2:?IEC 61850 Upgrade Cards for transformer monitoring systems for OEMs in Europe & NA –?Article?-?Webinar

SS3:?Ensuring 29% of Energy saving for International Telecom service provider by using Energy Management modules in Kalki.io –?Article??-?Webinar

SS4:?Design, Simulate and Validate IEC61850 SS for Major Australian Transmission Utility– Article?-?Webinar

SS5:?Monitoring & Controlling of Western European Windfarms from Distribution Centre using SYNC2100 - –?Article?-?Webinar

SS6: Ensuring autonomy of the Microgrid assets using Protocol Specific RBAC for Major Utility in the Asia Pacific?[DNP3 SA V5 / IEC60870-5-7] –?Article-?Webinar

SS7: Predicting Real-time fault location for radial networks in Europe using SYNC Zloop Analytics–?Article?-?Webinar

SS8:?Enabling Interoperability in Global Meter by incorporating DLMS-COSEM Protocol -?Article

SS9: Eltrix based Energy Billing and Settlement System for Major Power Plant in ME - Article

SS10: Enabling communication between multiple control centers for major transmission utility in Europe via ICCP – Article

SS11: Test Jig for Global RF communication modules used in Smart Grids - Article

SS12: Grid Metering for State Transmission Company in North India – Article

SS13: US Utility migration from old SCADA having 16K+ connections, after ensuring complete cut-over testing using ASE2000 simulator - Article

SS14: Monitoring of Bulk Water Storage and Supply System– Article

SS15: Regional Wide Area Monitoring Solution for providing Real-Time Situational Awareness – Article

SS16: Automatic generation of IEC 61850 Engineering files (SCD) for the European Utility using custom Engineering DB & defined rules – Article

SS17: Integration of multiple Solar / DER Sites to the control center of major US Utility, using IEEE 2020.5 protocol - ?Article

SS18: Setting up SCADA / Automation Lab for major Indian utility, addressing key use-cases of Evaluation, Engineering, Testing?and Security?- Article

SS19: Protection Data Collection & Analysis System (PDCAS) for the transmission system interconnected with the European Grid - Article

SS20: Enabling OEM Alarm annunciator with all the IEC 61850 use-cases, by directly plugging SYNC2XX boards - Article

要查看或添加评论,请登录

Fahid Kooloth的更多文章

社区洞察

其他会员也浏览了