Solar EPC Construction Progress Tracking with TaskMapper?

Solar EPC Construction Progress Tracking with TaskMapper?

Efficient construction / production tracking is one of the biggest challenges faced by Engineering, Procurement, and Construction (EPC) teams in solar project execution. Tracking daily progress, material utilization, and workforce productivity is time-consuming, requires significant man-hours, and can lead to delays and increased costs. Ensuring an accurate and up-to-date view of site progress is critical to keeping projects on schedule and within budget.

A New Paradigm in Solar Site Production Tracking The advent of advanced digital tools has revolutionized how EPC teams track production on solar sites. Traditional tracking methods relied on manual inspections, static spreadsheets, and disconnected reports, often leading to inefficiencies, delays, and miscommunication between stakeholders. However, with real-time digital reporting, EPCs now have access to a dynamic, data-driven approach that enhances visibility, accuracy, and decision-making.

At the forefront of this transformation are TaskMapper Construction and the TaskMapper App, the only custom-built tools available today specifically designed for seamless and efficient production tracking. Unlike generic software, TaskMapper solutions are purpose-built for EPC teams, providing a real-time, structured representation of site progress and ensuring streamlined project execution. Here’s how this new paradigm works:

  • Mobile Applications for On-Site Updates: Field teams can log progress updates, complete checklists, and report issues directly from their mobile devices. This eliminates the need for paper logs and ensures that every task is geo-tagged, time-stamped, and instantly available for review by project managers.
  • Seamless Task and Workflow Management: TaskMapper incorporates map-based task assignments, checklists, and approvals. This ensures that project managers can track every installation milestone—panel mounting, electrical work, and commissioning—in real time on a platform linked to a digital twin of the site.

By centralizing production tracking within a single system, TaskMapper Construction and the TaskMapper App provide a holistic, automated, and highly efficient workflow. EPCs can now eliminate guesswork, improve collaboration, and maintain tight control over construction schedules—leading to faster project completion, reduced costs, and higher profitability.

How does Production Tracking work on TaskMapper?

Step 1: Setting Up a Digital Twin in TaskMapper Before construction begins, the first step in TaskMapper is to create a digital twin of the solar site. This involves importing and overlaying CAD designs onto the project map, ensuring that the site layout and components are accurately represented. TaskMapper allows teams to organize the project into a hierarchical map of components, which helps structure the Bill of Materials (BOM) for better inventory tracking.

Once the digital twin is set up, construction progress workflows are attached to each component, outlining the installation steps and material quantities needed at different stages. This makes it easier to track progress and ensure that the right materials are available when needed. Additionally, component specifications, datasheets, and other reference documents can be linked to the digital twin, making important project details easily accessible. By establishing this foundation in TaskMapper, teams create a clear, structured view of the project, which helps in managing tasks efficiently as work begins on-site.

Step 2: Tracking Construction Progress in Real Time Once construction begins, TaskMapper enables real-time tracking of every installation step, ensuring that progress is accurately recorded and aligned with project timelines. Field teams can update daily reports directly from their mobile devices, logging completed work such as pile driving, racking installation, and module mounting. These updates are linked to the construction progress workflows set up in the digital twin, allowing project managers to track installations down to the last pile and module.

Reporting with the TaskMapper App is a breeze!

TaskMapper also includes proprietary tools to analyze work rates, identifying areas where progress is falling behind. This allows managers to quickly pinpoint bottlenecks, adjust resources, and reassign tasks to keep the project on schedule. By combining mobile updates, geospatial tracking, and data-driven insights, TaskMapper Construction and the TaskMapper App help EPCs maintain control over the entire construction process, ensuring efficiency and timely project completion.


Build intuitive views with any progress stream

Step 3: Integrate Production Tracking with Project Planning and ERP Tools To ensure seamless project management, TaskMapper allows EPC teams to connect real-time production tracking with project planning and ERP tools. Teams can upload MS Project or Primavera P6 files (with built-in support for TaskMapper’s own project management tool coming soon) and link on-map construction activities to scheduled tasks. This integration provides live progress updates, helping project managers compare planned vs. actual timelines and make informed decisions.


Additionally, TaskMapper enables easy export of production data in Excel format, making it simple to generate reports for management presentations or import into ERP systems. By bridging the gap between on-site progress tracking and broader project planning, TaskMapper ensures that all stakeholders have access to accurate, up-to-date project information, leading to better coordination and improved execution.


Conclusion


Effective production tracking is essential for the successful execution of solar projects, and TaskMapper Construction and the TaskMapper App provide the only custom-built, data-driven approach to managing every stage of construction. By creating a digital twin, tracking real-time progress with mobile updates, and integrating production data with project planning and ERP tools, EPC teams can ensure that projects stay on schedule and within budget. This level of visibility not only helps in identifying delays early but also enables better resource allocation and decision-making. With TaskMapper Construction and the TaskMapper App, solar construction teams can replace outdated tracking methods with a modern, integrated solution, ensuring efficiency, accuracy, and seamless project execution from start to finish.


Dennis Zimmer, P.E.

Owner - Principal Electrical Engineer at AcDc Engineering

3 周

Energy experts blast failed billion-dollar DOE solar project as 'financial boondoggle,' 'disaster' The Obama administration gave Ivanpah $1.6 billion in loan guarantees

回复

要查看或添加评论,请登录

SenseHawk的更多文章

社区洞察

其他会员也浏览了