Triumphs & Challenges for Lurin Bridge Reconstruction?

The Lurin Bridge accommodates over 30,000 vehicles daily, connecting the city center to the beach towns in southern Lima. 3F Constructora E.I.R.L was awarded the contract for reconstructing the bridge to facilitate the increased flow of traffic. The initial design used precast beams, but due to an unforeseen issue on site, the original beams were not able to be used. With only 25 days remaining before traffic resumed on the bridge, a new design was developed.??

EFCO’s aluminum E-Z SHORE? has a capacity from 16 to 28 kips (71 kN to 124.5 kN) per leg with a 2.5:1 safety factor.

EFCO Provides Quick Solution?

3F Constructora partnered with EFCO, using the lightweight E-Z DECK? system and SUPER STUD? towers to support and provide stability for the jobsite-built beam formwork. The work platform had to accommodate varying grade changes ranging from 1500 mm (5‘-0”) to 4780 mm (15’-8 1/4”) and span over the Rio Lurin. With a secure work platform, 3F Constructora was able to secure the beams to prevent any overturning while installing the slab formwork.?

“We contacted EFCO to provide us with formwork and shoring alternatives for the Lurin Bridge project. EFCO recommended the E-Z DECK shoring system. With their advice on solutions and in the field, we were able to overcome impasses that occurred during construction and deliver the work according to the deadlines committed to our client.” ? - Oscar Navarro, 3F Job Engineer?

Bridge Slab Support Ensures Stability?

Z-BEAMS?, E-BEAMS?, and Strong Arm Hangers were used to efficiently support the concrete slab. Utilizing the strength of E-BEAMS, EFCO engineers were able to design the support of the 200 mm (8”) thick slab with E-BEAMS at 500 mm (20”) centers, reducing material and labor. Hanging Z-BEAM and E-BEAM work decks allowed for the cast-in-place diaphragms to be placed with the bridge deck formwork.?

Galvanized steel E-BEAM? joists bolt to Z-BEAM? stringers and are excellent structural members to fasten plywood to for slab and deck forming.

Why 3F Constructora Chose EFCO?

Swift Solutions, Super Service & Collaborative Success?

The quick delivery of the E-Z DECK system, along with supporting components such as SUPER STUD, Z-BEAMS, E-BEAMS, and Strong Arm Hangers, played a crucial role in successfully meeting the deadline while upholding safety and efficiency standards. The seamless and efficient collaboration between EFCO's engineering and service teams prevented costly delays for both the contractor and the project owner. EFCO demonstrated its commitment to Quality products and Super Service, embodying our core values and providing the lowest in place concrete cost.??



EFCO EQUIPMENT

E-Z DECK, SUPER?STUD, E-BEAMS, Z-BEAMS


3F CONSTRUCTORA TEAM

Juan Aiquipa, Resident Engineer

Oscar Navarro Palacios, Job Engineer

EFCO FORMWORK SPECIALISTS–PERU

Rodolfo Quesquen , Territory Manager

Christian Arteaga , Field Supervisor

Daniel Fernandez, District Engineer


CONTACT OUR PERU OFFICE TODAY

Edificio Empresarial Nuevo Trigal,

Calle Los Antares No320, Torre B,

Oficina 703, Urb. La Alborada

Santiago de Surco, Lima – Peru

Phone: (51-01) 613-8700


要查看或添加评论,请登录

EFCO Forming & Shoring Solutions的更多文章

社区洞察

其他会员也浏览了