Setting Coordinates after completing the Revit Project  ??
Revit Coordinates..

Setting Coordinates after completing the Revit Project ??

Problem:- I have one base file in which I need to link 5 Models. But out of those 5 models, 2 models are not modeled using proper coordinates. So, When I am trying to link them in base file, they are not coming in place where it is needed. Client given me Excel in which coordinate values for all 5 models are available. So, what can I do now????

Let's start the work now. ???

Below is the screenshot of the base file. So, in which I need to insert Building B2 & B4 at right place (by Shared Coordinate option).

No alt text provided for this image

?But when I tried to insert buildings with share by coordinate, then it is showing result like below.?

No alt text provided for this image

I have the values of coordinates from excel which is provided in input.?

No alt text provided for this image

Let's start correcting coordinates for building B2. Open file B2.?

From the Visual Graphics, ON the project and survey base point. Now, you can see the values of Project and Survey base point values. In my case those values are 0,0,0.?

So, as we see, the bottom left coordinate of B2 building is N –10177, E –6753.?

Click on survey point, unclip it and then put values of N and E as N –10177, E –6753.Once done, then clip the survey point. Give same values to Project Base point.?Now unclip the Survey point again and give value as 0,0,0 and again clip it.Now do the same for the project base point.?

Now save the file and open the base model and then try to link B2 model with share by coordinate. ?

No alt text provided for this image

The model is at the correct location now. Use the same process for B4 Building.

Note:- The above process is differ according to the project and requirement of the project. I am just sharing my project experience. Let me know if there is any addition or any useful document on the same. ??

Ibrahima BODIAN

Ingénieur géotechnicien

1 年

I'll share this with

Prashant Patil

BIM Modeler Structure, Architecture, Fabrication, MEP.

1 年

You have to acquire coordinates for the other 2 files

要查看或添加评论,请登录

Swapnil Bhalekar的更多文章

  • True North and Project North in Revit

    True North and Project North in Revit

    In Revit, in every file or project; there is Project and a True North. The Project North is a virtual orientation used…

    3 条评论
  • NCS - United States National CAD Standard

    NCS - United States National CAD Standard

    What is in the NCS? It is a guide to what is required by todays Computer Aided Design software tools to create the…

  • Interesting things which Shared Parameter can do in Revit

    Interesting things which Shared Parameter can do in Revit

    What is it?- Shared parameters are parameters that you can add to families or projects and then share with other…

    1 条评论
  • BIM 360_New Project Creation

    BIM 360_New Project Creation

    BIM 360 helps team to track model issues with our Revit files with project teams working remotely. I love the Issues…

  • Augmented Reality vs. Virtual Reality

    Augmented Reality vs. Virtual Reality

    Augmented reality and virtual reality are two of the ways that tech can change the way you look at the world. The terms…

社区洞察

其他会员也浏览了