Self Build Nightmares - or, don't be scared, be prepared
Timber Frame by Solo Timber Frame

Self Build Nightmares - or, don't be scared, be prepared


This document is not supposed to scare you off or make you nervous about what lies ahead. No doubt you’ve watched the Self Build TV programmes and you already know the process won’t be easy. What we’re hoping to do here is prepare you for some of the issues that may lie ahead.

Remember that you’re building something totally unique. It’s an amalgamation of design, engineering, land, materials and people that has never been done before, so of course there will be problems, but it’s how you, your suppliers and your tradesmen manage these difficulties that will make the difference between total success and unnecessary stress.

We’d say that one of the biggest nightmares when undertaking a Self Build is finding your plot and obtaining planning permission to build your dream house, but let’s assume for a moment that all the paperwork and red tape is out of the way and you’re now planning to actually build your new home.


Utility providers

Allow yourself plenty of time to contact the electric, water, gas and telecoms companies. They are a law unto themselves when it comes to timing. 

Also, follow their instructions to the letter as you don’t want to give them any excuses for not installing, so for example, in the case of electric make sure you have your Part P certificates available when their operatives visit to make final connections.

Try not to be a Guinea Pig

No doubt you’ve visited countless Self Build exhibitions and seen the latest foundation technology or facade system. Take our advice and tread carefully. What is sold as the latest and greatest can turn into an expensive experiment.

This is especially important if you have a tight budget. The old adage ‘keep it simple’ is a very good one, so try to stick to tried and tested products.

Getting out of trade sequence

Every building job no matter how small has a trade sequence, whether putting up a shelf or building your own house and it’s important you understand your trade sequence and learn where you’re able to make adjustments to it.

For example, once your Timber Frame structure is erected the very first job should be putting on the roof covering in order that the building can settle under the weight of the tiles. If you were to somehow put the plasterboard on before the roof then cracking in the plaster will occur. Another no-no is painting being done at the same time the joinery work is being installed resulting in sawdust ruining your smooth paint finish.

Going over budget

Now we don’t mean spending more on your kitchen than you’d originally planned because you fancied a flashy worktop or high quality appliances. The only person you can blame for that is yourself and perhaps the kitchen salesman. What we mean is going over budget due to unforeseen circumstances. 

The only correct way to overcome this is to allow a contingency fund (typically 10%), but in our experience that can quickly be swallowed up in the foundations which are one of the unknown parts of any build.

We suggest allowing a separate contingency for the foundations and having a conversation with your appointed ground workers to find out what to expect if further work is required. For example, how much extra will you have to pay if you’re forced to dig deeper than planned or if you hit an unexpected obstacle.

You may not get a definitive answer, but sometimes making your tradesmen aware that you’re thinking ahead will make them think twice before seeing your difficulties as a money making opportunity for themselves.

Tradesmen not doing what you thought they’d do

It’s said that assumption is the mother of all screw ups (or something like that) and you’ll probably make some innocent assumptions, many of which you’ll get away with without even realising.

A good example of this is expecting your plumber to offer a complete package. Many do, but in some cases they expect the electrician to wire in the thermostatic controls. You can quickly find yourself with a plumber who can’t/won’t do the job and an electrician who wants more money to do the job.

Now you can try to become an expert on every aspect of your build and pick up these jobs yourself, pay the extra money or change your questioning to your tradesman, so instead of asking ‘what do you do?’ ask them to explain in detail ‘what don’t you do?’

Keep your site tidy

There’s nothing worse than an untidy site, so make sure your tradesmen know they are expected to tidy up after a day’s work. Sounds like no big deal until someone trips over and blames you.

Remember as a Self Builder you are the main contractor and you need to keep an eye on safety to protect your tradesmen and yourself.

Ordering used materials

This is a great way of saving money but are you sure that all the parts you need are included? Trying to source a specific piece from the original manufacturer can be hard and can quickly result in any savings you made being lost. 

We’re not saying don’t buy used, but we are saying caveat emptor.

Don't just stick to eBay where you may have to pay elevated P&P charges. There are local bargains to be had on platforms such as Facebook Marketplace and Shpock.

Bad weather

Not an easy one to overcome but you can prepare yourself for it. 

If you are choosing Timber Frame, make sure the supplier is providing a watertight roof. At Solo, our frames comes with a watertight roof as standard, so even if it’s too wet or cold to work outside you can work inside and if your roofer is delayed the frame won’t get damaged if bad weather sets in.

Tradesmen not showing up when they say they will

Allow breathing space in your schedule for this possibility and as with your budget allow a contingency for lost days.

It’s tempting to line trades up so that as soon as one is scheduled to finish, the next is there the following day. In reality this is unlikely to happen as weather, illness, broken tools and any number of legitimate (and illegitimate!) reasons can occur. You’ll be able to take this in your stride with a sensible schedule. 

Poor workmanship

Another difficult one to prepare for, but by taking a few simple steps you should be able to avoid it all together.

Don’t be the client that stands over people’s shoulders and watches every move, but do inspect work regularly and ask questions if there is anything you don’t understand or doesn’t look right. A good tradesman will be happy to answer your questions as long as they are concise and sensible.

Use legitimate companies that have a proven track record, a physical address and a land line telephone number so you have a degree of confidence that they won’t disappear overnight. Membership of a trade body shows they take an interest in their wider industry, but make sure they really are members and not ‘borrowing’ the logo!

Use members of ‘Trading Standards Buy with Confidence’. It’s a fantastic scheme administered by Trading Standards who undertake intensive checks on the business. 

If you’re struggling to find a certain trade, ask one of your other trusted traders for a recommendation. This has the added benefit of them probably having worked together on other sites, so understanding how each other works.

Trading Standards Approved






VAT Return

Rule number one - Keep your receipts and invoices safe. No doubt your home life may be chaotic during the project and taking care of paperwork will be low down on your list of priorities.

Do not keep the paperwork in your car. If it were to be stolen, you'll have to spend weeks rebuilding the missing paperwork. Don't ask me how I know this!

Do not pay VAT to anyone who is both supplying and installing products. Their invoices should be zero rated and if you pay it, the tax man won't pay you back and you'll have to approach the supplier for a refund which may not be forthcoming.

Remember, because you'll be getting the VAT back, this opens up a whole host of tradesmen and companies who you may not have considered had you been building an extension where VAT is payable. This means you can approach the slightly larger and perhaps more reliable company's who have to charge VAT as their turnover exceeds the HMRC levels. Thats not meant as a dig against the many fantastic one man band tradesmen, but a heads up that you have a wider pool of suppliers to call upon.


Thanks for reading. Can you add any other hints and tips to the list or help me improve the article? If so, let me know as I’d like to keep it updated and current.

Chris Davenport - Solo Timber Frame Ltd

?Copyright Solo Timber Frame Ltd 2020

No alt text provided for this image
Martin Clennell

Project Sales Team Leader - The world's finest hand-moulded composite decking and cladding.

5 年

Good article for self builders and for those of us that help them.

回复
Darryl Skelton

Modular Building transportation specialist.

5 年

Straight forward, but very good, solid advice for anyone who hasn't necesarily been there before.?

Jason (Jay) Hubbard

Managing Director at ENGLISH BROTHERS LIMITED Managing Director at ENGLISH BROTHERS BESPOKE SELF BUILD LIMITED

5 年

You did ok Chris. ????

Paul Brown

selfbuild alliance

5 年

Very nice Chris

Marcus Saunders

Account & Development Executive at Gallagher

5 年

Great article Chris ! People need to be told it straight

要查看或添加评论,请登录

Chris Davenport的更多文章

  • Dubious Plots Of Land For Sale

    Dubious Plots Of Land For Sale

    This post has nothing to do with social distancing or COVID-19, but everything to do with watching your back and making…

    1 条评论