See how BIM workflows enrich the construction process

See how BIM workflows enrich the construction process

Working in the construction industry has advanced to a great extent. It is because the team is able to use the newest forms of technology and standards that help them streamline the entire process. It is the step that every AEC professional and BIM industry follows to ensure that the outcome of the project is as per the expectations of the clients.?

Today, this article discusses the core details that help enhance the overall workflow and process of BIM services . Let us get to know more, in fact.

Any project that is initiated requires a detailed understanding and set process that helps avoid additional work along with delays. One thing that we all know is that spending maximum time on repetitive work, design, and documentation processes is always a tedious job. It is considered time-consuming, which leads to being unproductive and inefficient for the team and organization. Hence, to streamline the process, the team uses automotive technology to deliver data-enriched project information.?

No alt text provided for this image

The undertaking of Revit technology is quite an effective and excellent tool that assists the designers in creating proper and accurate information-oriented BIM models. But to make the work faster with the highest capabilities, the team suggests integrating Dynamo technology that amplifies its most increased capabilities.

Revit Dynamo automation process helps designers to simplify the BIM workflow along with its processes. It is a way that is continued through the process of defining the workflow systematically with computational design and data-driven #BIMautomation . We all know that the work of designing the BIM model requires the process of exploring multiple designs with a great outcome. This step will help get the work initiated without having built the structure manually. And for this, it is necessary that the team uses Dynamo technology as that helps get the information in a proper logical data environment.

Challenges

The next is to understand the challenges the team faces in BIM workflows. The execution of a project undergoes multiple tasks that can be repetitive, time-consuming, and not data-driven. Also, getting a coordinated BIM project detail in a documented way is a challenge that team faces. Here are some more listed below that are also quite challenging in the process of BIM workflow.

  • The delivery of the project is delayed for two core reasons, Repetitive work?and Time-Consuming tasks.
  • Chances of having rework done in the project due to human error or not proper quality check.
  • Unproductive and Under-experienced us of skilled workforce leading check of design and drawings repeatedly.
  • Not meeting the level of detailing and emphasizing the increased number of RFIs raised.
  • Lack of coordination and cooperation while communicating the details of the project.

These can be some of the reasons that lead to delay and are quite expensive in terms of challenges. Thus, to avoid such issues, here it is necessary to undertake the Dynamo Automation process that helps get these problems solved.

The Automation Process helps address the Challenges

The art of automation seems to be costly but is worth having in every process and level of work. The process of automating complete workflow helps diminish the need to perform the work in repetitive mode and to check errors manually. Here with the said process, the team is able to invest their time in other projects and their assigned tasks. It adds value to the overall project and justifies the project's needs and requirements. Also, it adds helping the team to isolate the BIM activities that are of low value and hamper the BIM activities. This additional time will help the engineers and architects to invest their time in another project with a high level of accuracy.

Revit Dynamo Automation Process

In the process of enhancing productivity and reducing the time scale of the project, the team at the organization needs to prioritize the work at their level to meet the deadlines of the project. Further, taking the help of customization adds value to the overall workflow as it is used with the Dynamo process. Also, to resolve the complexities at the design and modeling level, there are other #Revit plugins that simplify the process.

While undertaking automated workflows for the project there is a list of customized tools used. It helps enhance various BIM tools and stages like 3D Revit modeling , Revit enforcement, data extraction, etc.

Integrating Dynamo Technology into BIM workflow

Let us now share the process of integrating Dynamo technology into BIM workflow to get project work streamlined. Here are the steps and stages defined.

Adding Multiple Levels of work over Selected Levels

The work of creating a single level of design and drawings for one single project is not that complex or time-consuming. But, if the same work is required for multiple levels of projects, then yes team needs to think about it.?

To eradicate the process with easy leveling, the building designers can simplify this process. It will help leverage the simple tool-set to achieve the work at a different level with the art of a few button clicks. It will help share the required information and distance at work levels and add the total numbers of the levels and stages required for Dynamo to add more stages and levels above the selected levels.

Rotating Columns on a different axis

The team requires to check the level of the project from each side and this would be time-consuming if checked manually. Thus, to avoid this, the #automation process of #Dynamo helps diminish this level of work and helps resolve the issues from each axis and angle. It will indeed save time and energy for the engineers and architects to simplify the work and project details.

Data Output

The next level of work is to check the accuracy of the data with 100% detailing and proper outcome. Hence, it is necessary for the team to undertake the Dynamo process as it helps define the BIM workflow . The data output of the project is delivered in the way expected by the team. Here are the details,

  • Excel data sharing
  • Reviewing the scope of the project
  • Viewing the range of the manager
  • Setting the working reporter.

Visualization

Without visualization of the project detail, it cannot be taken further for the final delivery. Hence, considering this step is the process that simplifies the information and has details like,

  • Column Detailing
  • Quality Check and Quality Assurance
  • A span of depth ratio
  • Sliders Settings

Process Data

The project work goes with a set process that needs to be followed with and by the respective team. Here the process data specified are,

  • Data migration with mechanical requirements
  • Auto-set the location of the equipment
  • Adjusting the functional piping details
  • Clearing the space and room data.

Automated Sheet Updates

The team works on the project and thus based on the feedback of the client there must be a regular update on the data. So, with an automated process, this is quite feasible and reliable. The automated sheet updates mean having data,

  • Creating the sheet
  • Area monitoring and checking its boundary
  • Sheet Renaming and Resizing
  • Grid lines automation
  • Place a mark on multiple sheets
  • Change sheet mode to views
  • Proper testing of the upper case and lower case

Final Words

These are some of the core processes that help build a proper #BIMworkflow . Constructing the document with this level of accuracy will enhance the #BIM project and the teams at the project level to work with the highest precision.

Darshan Potdar, CMIT

Construction Management Grad Student at NYU Tandon | Estimating Intern at Infinite Consulting Corp.

2 年

Please consider if there are any openings in the BIM Feild

回复

要查看或添加评论,请登录

社区洞察

其他会员也浏览了