S4HANA Embedded Live-Cache Activation

S4HANA Embedded Live-Cache Activation

Within the S/4HANA environment, you have the flexibility to choose between activating the embedded liveCache for Supply Chain Management (SCM) functionality or maintaining your existing SCM liveCache in a separate system. This blog post will focus on the steps required to activate the SCM liveCache embedded within S/4HANA.

Key questions that will be addressed in this blog include:

  1. How to activate the embedded S/4HANA liveCache from a technical perspective?
  2. How to effectively monitor the embedded S/4HANA liveCache?
  3. How to activate the embedded S/4HANA liveCache to enable its functional capabilities?

Installation Process:

  1. Begin by reviewing the OSS note "2593571 – FAQ: SAP HANA Integrated liveCache" to gain a comprehensive understanding of embedded liveCache in S/4HANA.
  2. Utilize OSS note "2074843 – Version Matrix for HANA integrated liveCaches" to determine the precise version that needs to be downloaded and installed for your specific requirements.
  3. Follow the step-by-step manual installation instructions outlined in OSS note "2407589 – Manual installation of liveCache for S/4HANA." Please note that the duration of the installation process may vary from a few hours to several days, depending on your level of experience and system complexity.

By following these guidelines, you can seamlessly activate the embedded S/4HANA liveCache, enhancing your organization's supply chain management capabilities within the S/4HANA environment.

Technical checks

When you start the LC10 transaction, like you are used to on an SCM server, you will be redirected to the DB50 or DBACOCKPIT transaction:

Note :

The liveCache assistant (transaction LC10) is used only for monitoring an SAP MaxDB liveCache. To monitor the SAP HANA-integrated liveCache, use transaction DB50 or select the local database in transaction DBACOCKPIT.

In DBACOCKPIT you can see the 3 schemas for Livecache:

You can see all live cache-related technical parts:

Functional activation

After the technical activation, the functional activation has to be done in customizing for advanced planning and scheduling in SPRO.

And separately for global ATP:

Functional testing

After the activation, you can check to see all works by creation of new material in transaction MM01. The new tab Advanced Planning should be available now

Please connect and?follow?me for the next upcoming informative articles.

Cheers :)


要查看或添加评论,请登录

Muhammad Arshad的更多文章

社区洞察

其他会员也浏览了