Road Construction
Hady Shendy
Expert Projects Manager | Contract Facilitator | Planning & Risk Specialist | Certified in PMP, ACP, IRMCert, RMP
three processes:
- Setting Out
- Earthworks
- Paving Construction
Setting Out
312313 Subgrade Preparation
312316 Excavation
312323 Fill
Earthworks
- Sub-Grade
312000 Cut & fill with approved material soil to form grading the area to the finished formation level, Sub-Grade under it,
- Waterproofing
321113 then protect it by plastic sheeting or Sprayed bituminous
Paving Construction
Flexible or Rigid
- Flexible Paving
321116 Sub-Base
321126 Road Base
321216 Wearing Course Hot rolled Asphalt
- Rigid Paving
312000 Sub-Base
321113 Membrane
321313 Insitu Concrete Paving Slab
321216 Asphalt or other topping