Removal of RC Column using Steel Frame to double the RC frame span and using FRP/HPC to double the ground beam span

SCiA Engineer used to work out the loading on the existing column to be removed and on the existing ground beam
3D Rendering of the Existing Building shared by the Client Jaspar Group

Beta Design Consultants were commissioned by Jaspar Group to prepare the structural design for the removal of an RC column at the ground floor level of a four-stroey mixed-use building in Stanmore House, Harrow, North West London. Jaspar Group are dynamic family-owned Property Company with over 40 years’ experience in the design, conversion, and management of buildings and new structures into luxury residential and commercial spaces. The brief was clear, remove the column and use the existing services space without infringement on headroom. The contractor was appointed, they needed to confirm their installation cost so a concept design was required within a week from our appointment. The building includes residential flats owned by third parties at the top two levels so it was imperative that deflections be kept as low as possible.


Beta Structural Engineers established existing loading on the column using SCiA Engineer. They established the size of the steel frame required to support the RC building following the column removal. They also established the existing ground beam capacity and it was clear that the ground beam would not have been designed to support the loading of the revised scheme. The ground beam was designed to be supported on columns at even spacing and by removing the column, the ground beam was spanning twice the distance, leading to a large negative moment and shear force at the other remaining supports. Beta Design Consultants looked into using FRP plates for bending strengthening, and GFRP bars for shear strengthening but these did not offer the required capacity. In the end a mix of FRP and HPC was established as the best way forward. Tekla Structures was used to model the existing ground beam and the intended locations of the bars.

No alt text provided for this image
No alt text provided for this image

Beta Structural Engineers worked with Mapei Design Team to finalize the design and confirm the exact products to be used and their lead time. A suitable installaer was appointed to match the compressed programme.

Tekla Structures was used to model the existing ground beam rebars

Having completed the design, Jaspar Group and their Principal Contractor, asked Beta Design Consultants to prepare the temporary works design and propose the construction method statement. Mabey Props Mass 50 were used in conjunction with a system of needling to support the external wall during the erection of steel.

Some photos of the various stages of the column removal, ground beam strengthening and steel frame installation are included.

Ground Beam following installation of additional shear links
Steel frame installation following grond beam strengthening
The column is removed!


Nikos Bournis

Director of NB Consulting Engineers

5 年

Glad yo hear that SCIA Structural Engineer software made a contribution to a part of your project Fahed Maida Eleftherios Karpozilos

Derek Allen Mason

I’m a Chartered Structural Engineer working in partnership with architects to achieve their outstanding designs that really “wows” their clients.

5 年

Congratulations Fahed and the Team, looks like an interesting project. Well Done.

回复

要查看或添加评论,请登录

社区洞察

其他会员也浏览了