QC Process Table and Standardized Work
“QC Process Table.” It's not a popular theme or tool despite its importance.
A table to design and manage quality control at the process level. There are many formats and different names. But the importance is in the thinking behind the documents.
The critical thing about QC Process Table and Standardized Work is that they need to be utilized together. Definitely, not to be used separately. The two should be directly connected. Excellent standardized work requires a QC Process Table, while a good QC Process Table needs standardized work.
Here are some items we need the two to work together.
1?? Both are more than just filling out the document.
The saddest attitude toward these two methods is that many think it is about filling out the forms. No, it is not. The documents are designed to follow a flow of philosophy. And, as we write or draw things on these papers, we should be thinking. We should consider a better way to build quality into the process.
And there should be teamwork to create the two. The primary responsibility exists. The QC Process Table by the quality and the team leader's standardized work. But that doesn’t mean those responsible people should be left alone in the creation. There was a case in which an engineer who had just graduated from college made a QC Process Table—obviously, it failed. But the engineer should not be blamed. It is the lack of teamwork that we should reconsider. The quality function and the frontline management should continuously work together to implement and improve the QC Process Table and standardized work.
2?? Too many…
Another common problem I observe is that we define too many control points, which, in the end, we are controlling none. It may be human psychology, but some think more is better. But the more control points we have, the more likely we will forget or become hard to include inside the standardized work. At the same time, this doesn’t mean “compromising” on quality. We can’t simply take out or eliminate the control points. We need to Kaizen.
At one place, a control point was to check the cleanliness of a product. This check was included in many processes since they had many customer complaints. As we investigated this problem, we discovered that the process was cleaning liquid leaking from the product. And there were no standards on how much liquid to pour into the product. So, we defined the quantity of liquid and placed a flowmeter to control it. Since the leakage was under control, we didn’t need to check cleanliness at every station. We still need to control the flowmeter, which requires much less frequency. We were able to reduce the control points without sacrificing the quality. When we have too many control points, we must work to reduce them as a team.
3?? Frequency
Frequency is another area where we need consideration. Frequency without a policy is almost the same as chaos.
There was a process that was supposed to check quality at every 50, 75, 87, and 115 products they produced. Each check relates to the different tooling they use in the machine. And when these checks needed to happen at ongoing operations, it was a disaster. The program that controls these checks will stop the machine, and the machine keeps stopping. We had to create some divisor or multiple relationships among the checks.
领英推荐
Another example is the mixing of frequency with time and quantity. Some checks happen every hour. Some checks happen based on the amount produced. Therefore, in ongoing operations, there are situations in which both happen simultaneously. Many will say, let the shop floor “figure it out.” So they don’t check on exact timing or quantity. But then, is there a guarantee of the quality? When we did not conduct the check at the precise moment, the QC Process Table died logically. The freedom to adjust the frequency will lead to assumptions that it is okay to skip the check at the moment defined by the QC Process Table. And, many plans are dead since such frequencies are not planned carefully. What frustrates the shop floor is that the plan has many such pitfalls, yet they get blamed for not following it.
4?? Respect
Another example is the respect of those who follow these QC Process Tables and standardized work. One example was when a team leader was summoned to attend a meeting and left the shop floor. It did not return for the control points. What is contradicting is that the quality, the designer of the QC Process Table, summoned the team leader.
There are jokes among many plants that the night shift performs better than the day shift. Why? Because they are less interrupted. People can focus on their work. Respect for people starts with respecting the focus of the work. Nobody should interrupt. Yes, there are many situations which we have to interrupt. If so, ensure we follow their standards before interrupting. It is very hard to problem-solve, “Hide Oba interrupted the team leader from executing the QC Process Table” after it happened.
5?? Kaizen
Last but not least, these QC Process Tables and standardized works are the subject of Kaizen. I made a similar post in the past. If any defects are produced, both should become the subject of Kaizen.
QC Process Table and standardized work are potent tools to Build-in quality if adequately used together. Those tools are part of a system, not an independent stand-alone tool.
Those of you who follow my post will see that these tools have the “structure” that I always mention.
Points: Control points
Lines: Check methods, frequency
Area: Standardized work
Body: Mechanism of executing the control plan at multiple levels of organization, System of help, and Kaizen
Independent items will not function correctly unless we have the entire structure.
Director / Manager | Global Lean Manufacturing | Operational Excellence | World Class Manufacturing| Toyota Production System | Continuous Improvement | Six Sigma | EHS | Automotive | Pharma | Semicon | Packaging
9 个月Jeroen Teunen
Lean Systems Professional, Standardization and RCA SME
9 个月Fantastic presentation of how one can not efficiently work without another- people involvement, work standardization, build in quality and continuous improvement are shown in your article as fingers of one hand - depend on each other, support each other and logically develop together the right flow( when used correctly). These interdependences are the true value creators in my humble opinion. Thank you again Hide Oba for a great read ??.
Quality & Continuous Improvement Professional
9 个月Are you saying this is similar to the 'Control Plan' that is an offshoot of a PFMEA process (wich uses the work instruction as a baseline) except this QC Process Table uses the Standardized Work as the baseline?
Senior Quality Professional
9 个月Think this was called MQC in my Toyota experience
Consultant, Published Author, Course Designer, Owner iA-Inventory Academy and GetAirPal, Consultative GM, VP Sales A/Asia AI-IDP
9 个月I can see how this methodology has transitioned into automated warehousing operations. The KPIs metrics are formulated by 'process' requirements. These are captured through sensors and recorded activity. Tolerances are set against the baseline with CI actions initiated on the variances that fall below or above acceptable percentage levels. I can see the time in the near future where actions will be initiated by systems when the tolerances are breached. This same process can be used for all types of business. The key point that the control charts align businesses to are measurement and quality. Thank you again for a great read..