QA/QC Personnel must Know
Engr Shahzado Jalbani
Incharge QA&QC |Quality Management|ISO9001:2015 QMS|Infrastructure|Luxurious Villas|Building| Oil &Gas| Water and Waste Water|
2.????? Role and responsibilities
3.????? Contract Documents
4.????? FIDIC Contract clauses
5.????? Specification of the project
6.????? Requirement of the project
7.????? Scope of works
8.????? Bill of Quantity (BOQ)
9.????? Quality documents
10.?? Quality Policy
11.?? Quality Manual
12.?? Quality Objective
13.?? Quality Organizational Chart
14.?? Quality Meeting
15.?? Quality Management system
16.?? Approval of QMS Documents
17.?? Quality Management Plan (QMP)
18.?? Project Quality Plan (PQP)
19.?? Quality Procedure
20.?? Inspection and Test Plan (ITP)
21.?? Quality Inspection Plan (QIP)
22.?? Quality activity Checklist
23.?? Document Submittal Forms-Submit all the documents for approval of Documents.
24.?? Material Submittal Forms, submit all the material used at the project for the approval of material
25.?? Document Review Form
26.?? Document Transmittals
27.?? Material Transmittals
28.?? Request for Information (RFI)
29.?? Material Inspection Report (MIR)
30.?? Work Inspection Report (WIR)
31.?? Mill Test Certificates (MTC)
32.?? Prequalification for Subcontractors
33.?? Prequalification of Independent 3rd Party Testing agency
34.?? 3rd Party testing reports and records
35.?? Geotechnical reports
36.?? Requirement of concrete compressive strength
37.?? Concrete raw material selection
38.?? Concrete Mix Design
39.?? Calibration Certificates (Total station, Level machine, GPS, Compressive strength machine and Batching plant and others as per requirement of the project).
40.?? Check Laboratory at site is established as per requirement of the project
41.?? All the Laboratory Equipment are calibrated prior to tests
42.?? Check Laboratory personnel qualifications and Experience
43.?? Check the frequency of testing of raw material established
44.?? Check tests are conducted as per developed frequency of testing
45.?? Concrete Trial Mixes
领英推荐
46.?? Concrete tests for Trial Mixes
47.?? Machinery and Equipment HSE Checklist
48.?? Machinery Operator Certificates
49.?? IFC Drawings (Civil, MEP and Architectural)
50.?? Shop drawings
51.?? Construction of Mock up
52.?? Layout for Excavation
53.?? Soil tests reports
54.?? Field density test reports register
55.?? Anti-termite spray
56.?? Lean concrete
57.?? Water proofing membrane if required
58.?? Screed concrete over water proof membrane
59.?? Steel rebar tests report and qty record for steel reconciliation report
60.?? Bar bending Schedule (BBS) for Raft Foundation, Combine and Isolated footings etc as per requirement and as per IFC or approve shop drawing.
61.?? Skilled personnel required for Cutting, Bending and Fixing of Steel rebars at site
62.?? Good quality of Formwork required
63.?? Water stopper installation if required as per manufacturer recommendation, check End joint it shall be Butt joint instead of Overlap.
64.?? Inspection of Steel rebar and Formwork
65.?? Allow for Pouring of concrete check weather condition and availability of required material
66.?? Check vibrators are being used while concreting
67.?? Check testing of fresh concrete are being conducted at batching plant and site too, Slump, Temperature and Air content.
68.?? Cylinders or cubes are being casted as per requirement
69.?? Finishing of Concrete work as per requirement
70.?? Start curing as concrete hard it depends on temperature at site
71.?? Curing is important, many contractors ignore curing
72.?? Curing if water available, it’s better to cure concrete with water if not, curing compounds are allowed.
73.?? Curing shall be carried out as per requirement of the project and applied during trial mixes.
74.?? Striking of Formwork as per specified in the procedure
75.?? Find the defective part of the work and record through Nonconformance report
76.?? Take corrective and preventive actions
77.?? Correspondence record through emails, letters
78.?? Site Memo Log, Site observation Log and NCR Log
79.?? Closure of NCR log
80.?? Continue activities as per approved IFC and shop drawings
81.?? Apply water proofing membrane and protection board as per required level
82.?? Approve the backfilling material and apply it layer wise as per required specification
83.?? Record fresh concrete production
84.?? Record Concrete ingredients raw material quantity and tests reports
85.?? Quality site walk report
86.?? Quality Audit report