The Purpose of Competent Scheduling


?

Introduction

Contrary to popular belief and acceptance, Scheduling was not created to become a crude art form. If that’s what you want to believe, then you’ll need to obtain an easel, a stretched canvas, oil or acrylic paint, brushes, and spatulas, and then learn some skills to produce better artwork than simple horizontal lines.

A scheduling program’s primary purpose is to provide a record format of the future of a project or program, including its exact status at any time, the costs expended to date, what the future price will be, and the facts of completion dates. It produces reliable reports only when operated by competent persons utilizing competent information.

I am utilizing this opportunity to fuss at many people who have been getting and expecting it wrong all along. This people number includes “Would-be Schedulers, Owners, and all others who expect and/or just accept Gantt lines on a page as a schedule.”? This disrespects our profession, not unlike someone imitating a medical professional or a police officer. All have been lucky not to be prosecuted, like an imitator of these other professionals would yield for you.

I know, some will say, there is no other way to learn. However, if there were genuine interest in the profession, more would be aware of the highest-ranking organization in the world: The Guild of Project Controls, a Division of Planning Planet. If anyone wishes to obtain and retain a copy of Dr. Giammalvo’s Analysis, contact this author or perform an online search at: “Project Management Certification Benchmarking Research: 2015 Update Dr. Paul D. Giammalvo, CDT, CCP, MScPM, MRICS, GPM-m.

When we assemble a Project Control Team, training occurs in all phases of the profession, including the proper scheduling method, whereby every red cent and productivity number is recorded. This Author has moved beyond P6 to where Microsoft Project Professional rules the roost with its supreme functionality.

This Author has offered to open Centers of Excellence where all participants can learn the product's complete functionality in genius hands. If you wish to remain a crude, meaningless work artist, then do so, but I’m here now to tell you that your artist days are numbered. ????

All facets of engineering work with numbers based on historical information established through rigorous analysis. Scheduling is a definitive segment of engineering. ?This reliance on historical data is a cornerstone of our field, and I'm particularly proud of my son, Charles Ryan Lowery, an F.E.A., Finite Element Analyst. As a testament to this, working with the pure numbers of Science/Materials/Mathematics, Mensa activity work runs high in our family/generations.

Modern scheduling software has evolved to meet humanity's needs, offering designed functionalities that make Scheduling a science of analysis and reporting. This evolution, matched with my Author’s skill and 150+ I.Q., is a fascinating development in our field.

The world was enamored with the functionality of P6, Primavera Professional, so long that they couldn’t see past the end of their noses. Today, I’m here to clear the historic fog of misunderstanding and receivership of much less than correct.

Perhaps some of this misunderstanding was my own doing. I’d said in my resume that I can make estimates up to one trillion dollars. So, let me clarify this for all to understand. This statement might have been taken out of context. What I mean by this is that Microsoft Project Professional is only limited to one trillion per Schedule. This means the program is accurate to any value of up to one trillion and has the functionality through human input by an expert to capture the exact costs of any size project.????

The software’s Power/Functionality

Here we are, in the second and third decades of the 21st Century, and MS.P.P. Microsoft Project Professional is a super functional program designed to serve the complete needs of any business, city, county, or state. Since it was designed to work with and utilize the full functionality of Windows, the NOTES in each of the.

How Powerful is Microsoft Project Professional?

?Four hundred thousand tasks and 700,000 resources will open MS Word or MS Excel. Then, some will ask if there is any advantage to this. This 150+I.Q. will explain now. Word for Windows 11 is 5,000 Pages per file. In a test I performed, there are 56 lines per page, so 56 x 5,000 = 280,000 items per file that can be stored as hyperlinks, and if all these notes were word files, we have 280,000 x(400,000 +700,000) =112,000,000,000 hyperlinks. And, if we use Excel, with enough RAM (400,000+700,000) = 1,100,000 workbooks. Once we open one hyperlink, additional hyperlinks on the newly opened become useful. The Excel workbooks on this computer are 18 pages per workbook, and Excel for Windows 11 has 36,000 hyperlinks per workbook worksheet page. So, 18 x (1,100,000 x 36,000) =396,000,000,000, three ninety-six billion documents, and we can do the same with additional ones. Always remember that this author keeps four terabytes plugged into this computer.

That was a lot of verbiage concerning hyperlinks. With a P.C.T. Project Control Team, consultants do not need to make C.S.V.s, document Control, or even a P.M. when all aspects of the project are controlled electronically.

?

How Functional is Microsoft Project Professional?

1. ?Within the hands of an expert, exact percentages of completion of any/all crafts in an electronic PowerPoint file are generatable at any time.

2. ?Additionally, it is only limited to one trillion dollars per schedule or 1,666,666,666 Hours for ship building or office design work ????

?

An Expert’s Clues:

1.?????? How many “Schedulers” can detail every person’s work on a project to a point of instruction?

2.?????? How many “Schedulers” can perform an exact estimate?

3.?????? How many “Schedulers” can perform as the scheduler and document control simultaneously? ?

?About this Author

I created my dissertation for a PhD in the Science of Project Control only to convey my current point of knowledge of all crafts, which increases daily due to numerous inputs.

This author has an associate degree with more technical schooling than a BSc. and is a Guild of Project Controls, GPS Cert# 00011. The Guild is the highest-ranked organization in the world. ?And has more than 10,000 hours of experience.

?

Inventions ?

1.?????? I.M.S. An Integrated Master Schedule can capture up to one trillion dollars per schedule. ?

2.?????? I.M.P. Integrated Master Plan, with written assignments if needed.

3.?????? R.O. Resource Optimization is a procedure for uncovering the longest paths through a project/program

4.?????? P.C.T. Project Control Team, to establish and maintain budget and complete record/document control

5.?????? C.M.S. Competency Management System, by W.B.S. ?

?

Specialized Training I received ?

A.1.?? At Olin Corporation ?

A.1.1.? Risk Analysis Facilitator Training

A.1.2.?? Quality Control Team Facilitator

A.1.3.? B.Q.C.C. Budget Quality Control Committee.

A.1.4.? L.S.U. Supervisory Schooling

A.1.5.? Troubleshooting the Leeds &Northrup system

A.1.6.? Analytical Problem Solving

A.1.7.? Statistical Process Control

A.1.8.? Predictive Analytics?

A.2.?? In my degree Work

A.2.1.? ?More technical than a BSc., from C.D.S. &P.S.U. and as told me by my independent test proctor, Professor, Dr. Ed Murray. ?

A.2.2.? All construction machinery work

A.2.3.? Industrial Psychology with a Focus on Time/Motion

?

?

My writing Skills, since 1964? ?

1st.????? The proper method to determine the number of employees needed in operations and maintenance

2nd.??? J.S.I. Job Safety Instructions

3rd.???? J.T.A. Job Tasks Analysis

4th.???? “Handbook of Industrial Construction and Maintenance Assemblies”

5th.???? S.O.P. Standard Operating Procedures for three chemical plants

6th.???? “The Encyclopedia of Risk Analysis and Opportunities Identification.”

7th.???? “The Project Control Engineer’s Handbook for all Industrial Projects.”

8th.???? The Guild of Project Controls needed S.O.Ps, 12 each

The below are subject property copyright of the Guild of Project Controls?, but gives you a clear ?idea of whom should be performing your scheduling work for you. This reveals the knowledge realm of Guild Fellows. ?


1.?????? Managing Project Controls

2.?????? Developing the Project Controls Plan

3.?????? Managing People

4.?????? Managing Risk & Opportunity, including schedule risks

5.?????? Develop the Contracting Policies & Procedures Manual

6.?????? Managing Resources

6.1.? I know about industrial construction and turnarounds to set all crew sizes to meet a defined deadline.

7.?????? Managing Planning & Scheduling

8.?????? Managing Project Cost Estimating & Budgeting

9.?????? Managing Project Progress

9.1.? I will generate PowerPoint files for numerous progression and remaining work reports ?

10.???? Managing Project Change

11.???? Managing Project Databases

11.1.?? I am a database specialist ?

12.???? Managing Project Forensic Analysis

12.1.?? How many schedulers make defendable schedules?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?

?


?

Anthony L. Lowery

I-phone 337-853-5333

Please text first so I don’t miss your call

Email, [email protected]

?

?

?

要查看或添加评论,请登录

Tony Lowery的更多文章

  • Project Control Engineers

    Project Control Engineers

    Project Control Engineers As a Guild of Project Controls Fellow and one who is also an Assessor aiding in the…

  • For a Center of Excellence

    For a Center of Excellence

    For a Center of Excellence General Note: In this modern electronic age, there is no need for relocation or daily travel…

  • Proper Scheduling

    Proper Scheduling

    Some of you who call yourself schedulers, don’t take this personally, as you are giving others precisely what they…

  • Purpose for a Center of excellence

    Purpose for a Center of excellence

    Purpose Project Controls is a science, and modern scheduling software was designed with the needs of a Professional in…

  • Consolidated Projects by a world Expert 00011

    Consolidated Projects by a world Expert 00011

    Consolidated Projects Nine hundred ninety-eight each sub-project or sub-Csectional can be attributable to and…

  • Article for Linked-In

    Article for Linked-In

    Article for Linked-In I’m still trying to convey that the only accurate schedule is one that encompasses the total…

  • A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning As a World-class Fellow and expert Planner/Scheduler, GPS #00011, with the…

  • A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning

    A bit of Pre-notice or perhaps forewarning As a World-class Fellow and expert Planner/Scheduler, GPS #00011, with the…

  • COE Center of Excellence

    COE Center of Excellence

    COE Center of Excellence Hello, The truth is stranger than fiction and still remains so even in this 21st-century stage…

  • Scheduling Software and A World Expert’s Evaluation

    Scheduling Software and A World Expert’s Evaluation

    Contents ABSTRACT. 3 Purpose of this document.

社区洞察

其他会员也浏览了