Project Management

Project Management

5 Phases of Project Management

“Project management is the application of knowledge, skills, tools, and techniques to a broad range of activities in order to meet the requirements of a particular project.” There are five phases of project management and if the lifecycle provides a high-level view of the project, the phases are the roadmap to accomplishing it.

Phase 1: Project Initiation

This is the start of the project, and the goal of this phase is to define the project at a broad level. This phase usually begins with a business case. This is when you will research whether the project is feasible and if it should be undertaken. If feasibility testing needs to be done, this is the stage of the project in which that will be completed.

 Important stakeholders will do their due diligence to help decide if the project is a “go.” If it is given the green light, you will need to create a project charter or a project initiation document (PID) that outlines the purpose and requirements of the project. It should include business needs, stakeholders, and the business case.

 Tip: When creating a PID, don’t get too bogged down in technical requirements. Those will be clarified and clearly defined in Phase 2.

Phase 2: Project Planning

This phase is key to successful project management and focuses on developing a roadmap that everyone will follow. This phase typically begins with setting goals. Two of the more popular methods for setting goals are S.M.A.R.T. and CLEAR:

 S.M.A.R.T. Goals – This method helps ensure that the goals have been thoroughly vetted. It also provides a way to clearly understand the implications of the goal-setting process.Specific – To set specific goals, answer the following questions: who, what, where, when, which, and why.

Measurable – Create criteria that you can use to measure the success of a goal.

Attainable – Identify the most important goals and what it will take to achieve them.

Realistic – You should be willing and able to work toward a particular goal.

Timely – Create a timeframe to achieve the goal.

 C.L.E.A.R. Goals – A newer method for setting goals that takes into consideration the environment of today’s fast-paced businesses.

Collaborative – The goal should encourage employees to work together.

Limited – They should be limited in scope and time to keep it manageable.

Emotional – Goals should tap into the passion of employees and be something they can form an emotional connection to. This can optimize the quality of work.

Appreciable – Break larger goals into smaller tasks that can be quickly achieved.

Refinable – As new situations arise, be flexible and refine goals as needed.

 During this phase, the scope of the project is defined and a project management plan is developed. It involves identifying the cost, quality, available resources, and a realistic timetable. The project plans also includes establishing baselines or performance measures. These are generated using the scope, schedule and cost of a project. A baseline is essential to determine if a project is on track.

 At this time, roles and responsibilities are clearly defined, so everyone involved knows what they are accountable for. Here are some of the documents a PM will create during this phase to ensure the project will stay on track:

  • Scope Statement – A document that clearly defines the business need, benefits of the project, objectives, deliverables, and key milestones. A scope statement may change during the project, but it shouldn’t be done without the approval of the project manager and the sponsor.
  • Work Breakdown Schedule (WBS) –This is a visual representation that breaks down the scope of the project into manageable sections for the team.
  • Milestones – Identify high-level goals that need to be met throughout the project and include them in the Gantt chart.
  • Gantt Chart – A visual timeline that you can use to plan out tasks and visualize your project timeline.
  • Communication Plan – This is of particular importance if your project involves outside stakeholders. Develop the proper messaging around the project and create a schedule of when to communicate with team members based on deliverables and milestones.
  • Risk Management Plan – Identify all foreseeable risks. Common risks include unrealistic time and cost estimates, customer review cycle, budget cuts, changing requirements, and lack of committed resources.

Tip: When creating a WBS, work packages shouldn’t be longer than 10 days. 

Phase 3: Project Execution

This is the phase where deliverables are developed and completed. This often feels like the meat of the project since a lot is happening during this time, like status reports and meetings, development updates, and performance reports. A “kick-off” meeting usually marks the start of the Project Execution phase where the teams involved are informed of their responsibilities.

 Tasks completed during the Execution Phase include:

  • Develop team
  • Assign resources
  • Execute project management plans
  • Procurement management if needed
  • PM directs and manages project execution
  • Set up tracking systems
  • Task assignments are executed
  • Status meetings
  • Update project schedule
  • Modify project plans as needed

 While the project monitoring phase has a different set of requirements, these two phases often occur simultaneously.

 Tip: Consider using cloud-based project management software so team members can update task status in real time. 

Phase 4: Project Performance/Monitoring

This is all about measuring project progression and performance and ensuring that everything happening aligns with the project management plan. Project managers will use key performance indicators (KPIs) to determine if the project is on track. A PM will typically pick two to five of these KPIs to measure project performance:


  • Project Objectives: Measuring if a project is on schedule and budget is an indication if the project will meet stakeholder objectives.
  • Quality Deliverables: This determines if specific task deliverables are being met.
  • Effort and Cost Tracking: PMs will account for the effort and cost of resources to see if the budget is on track. This type of tracking informs if a project will meet its completion date based on current performance.
  • Project Performance: This monitors changes in the project. It takes into consideration the amount and types of issues that arise and how quickly they are addressed. These can occur from unforeseen hurdles and scope changes.

During this time, PMs may need to adjust schedules and resources to ensure the project is on track

Tip: Review the business case at the end of each phase and make adjustments to the project plan as needed.

Phase 5: Project Closure

This phase represents the completed project. Contractors hired to work specifically on the project are terminated at this time. Valuable team members are recognized. Some PMs even organize small work events for people who participated in the project to thank them for their efforts. Once a project is complete, a PM will often hold a meeting – sometimes referred to as a “post mortem” – to evaluate what went well in a project and identify project failures. This is especially helpful to understand lessons learned so that improvements can be made for future projects.

 Once the project is complete, PMs still have a few tasks to complete. They will need to create a project punchlist of things that didn’t get accomplished during the project and work with team members to complete them. Perform a final project budget and prepare a final project report. Finally, they will need to collect all project documents and deliverables and store them in a single place.

 

Tip: Using a cloud-based software solution is an easy way to collect and save all project documents in one location throughout the life of the project. 

What is Smartsheet?

Smartsheet is a spreadsheet-inspired task and project management tool with powerful collaboration and communication features. With templates and customization options, it’s easy to build a project management plan that fit the needs of any project. By providing a broad range of views including Gantt, calendar, and traditional grid, as well as Smartsheet SightsTM dashboards, you can manage projects the way you want. Track project requirements, store documents, create timelines, and organize key details.

Plus, with Smartsheet’s newest view, Card View, teams have a more visual way to work, communicate, and collaborate. Card View enables you to focus attention with rich cards, provide perspective with flexible views, and prioritize and adjust work more visually. Categorize cards into lanes to organize your work more visually. Display information on cards including custom fields, images, and color-coding to better focus your team’s attention. Intuitively change lanes and filter cards to see the flow of work from multiple perspectives. Act on tasks and change status of work by dragging and dropping cards through the lanes to immediately share updates with the entire team.


要查看或添加评论,请登录

Remigijus Remis Stirbys的更多文章

  • ROOFING SYSTEMS

    ROOFING SYSTEMS

    In this article, when we say "roof", we mean a sloped cover to a building, made of any material, and we do NOT mean a…

  • Building Foundations

    Building Foundations

    INTRODUCTION TO FOUNDATIONS A foundation (or, more commonly, base) is the element of an architectural structure which…

    4 条评论
  • ELEMENTS OF CONSTRUCTION

    ELEMENTS OF CONSTRUCTION

    FLOOR FINISHES AND HOW TO CHOOSE THEM When choosing a floor finish, keep in mind the following: How slippery or smooth…

  • The six Types of Contracts

    The six Types of Contracts

    A construction contract is a mutual or legally binding agreement between two parties based on policies and conditions…

  • Construction Technology

    Construction Technology

    These projects require latest construction technologies, equipment, and materials. Role of technology in building…