The “fundamentalists” of lean and the Toyota Production System are always defending line balancing.

?

Line balancing consists in balancing operator and machine time to match the production rate to the takt time.

?

Takt time is the rate at which parts or products must be produced in order to meet customer demand.

On a production line perfectly balanced the production time is exactly equal to takt time.

The production operations are rearranged to remove bottlenecks or excess capacity.

?

The benefits are supposed to be:

  1. Reduce waiting waste – that occurs when operators or machines are waiting for materials from a previous task.
  2. Reduce inventory waste – that is an excess of raw materials, work in progress (unfinished goods), or finished goods.
  3. Absorb internal and external irregularities – a balanced production line is expected to be stable and flexible enough to adapt to changes, reducing variation.
  4. Reduce production costs and increase profits - no operator is standing idle, machines are used to their full potential.?


But

No alt text provided for this image

about 20 years ago I read the book "The Goal" from Eliyahu M. Goldratt and the theory of "statistical fluctuations".

Well I am an Engineer and as such I use mathematics to find answers and guarantees.

So I created an Excel file to do some mathematical simulations.

?Process assumptions:

  • 3 consecutive operations
  • parts are moved between operations every hour
  • 1 shift (8 hours) per day

?

Scenarios:

  1. All production rates equal, as hourly production rate variations equal
  2. Production rates increasing, as hourly production rate variations equal
  3. Production rates decreasing, as hourly production rate variations equal

?

With ±2% hourly production rate variation

No alt text provided for this image
No alt text provided for this image

Balanced process does not achieve target daily production, during 220 days average, with an average deviation of -84 units per day.

With ±10% hourly production rate variation

No alt text provided for this image
No alt text provided for this image

Balanced process does not achieve target daily production, during 220 days average, with an average deviation of -398 units per day.

With ±20% hourly production rate variation

No alt text provided for this image
No alt text provided for this image

Balanced process does not achieve target daily production, during 220 days average, with an average deviation of -802 units per day.


Both remaining scenarios (increasing production rates and decreasing production rates) are always better than the balanced process.

The best end of the day WIP level is always attained by the increasing production rates process.


These calculations and simulations raise many doubts about one of the main lean concepts.


#productivity ;#processimprovement ;#lean ;#leanmanufacturing


要查看或添加评论,请登录

Jo?o Leite的更多文章

  • Repeatability & Reproducibility - R&R Study

    Repeatability & Reproducibility - R&R Study

    The problem In the world of industry, there are often situations where there is a dispute between the customer and the…

  • Tolerance Stackup Analysis

    Tolerance Stackup Analysis

    In the article “Process Performance (capability)” we talk about process performance indicators (aka “capability”)…

  • How to calculate sample size for statistical control

    How to calculate sample size for statistical control

    When we are implementing improvements in the process, or when we want to evaluate the current process, we have to carry…

  • Optimization of Production Batches vs SMED

    Optimization of Production Batches vs SMED

    When analysing the cost of production we normally focus on optimizing the cycle time. But let's verify the impact of…

  • Sourcing die sets overseas

    Sourcing die sets overseas

    More than a decade ago, I heard a globally influencer on the automotive industry saying “The question is not "if" we…

  • Free magazines, technical articles and webinars

    Free magazines, technical articles and webinars

    Sometimes the biggest limitation of a self-taught person is the budget (sometimes called "time") they have to do…

  • Kinetic energy and the Sheet Metal Stamping

    Kinetic energy and the Sheet Metal Stamping

    Let’s try to use Kinetic energy to understand and improve reliability on sheet metal stamping dies. Kinetic Energy…

    1 条评论
  • Productivity vs Average Income

    Productivity vs Average Income

    Since I started working on the end of last century, the global market as changed a lot. Since then, I hear about Toyota…

  • Relationship between Cpk and Tolerance Interval

    Relationship between Cpk and Tolerance Interval

    When we are making feasibility analysis or designing a new product it’s easy to misevaluate our capacity to attend the…

  • Who is The Swiss Army Knife in Switzerland

    Who is The Swiss Army Knife in Switzerland

    Everybody knows the swiss army knife, but perhaps nobody thought of who is currently being the multipurpose tool on…

社区洞察

其他会员也浏览了