Name this ?? 24-inch pipe material our crews removed in the insertion/receiving pit on a CompressionFit project. The main is a sewer force main. #wastewater
关于我们
Our purpose is to help cities add value to their water & sewer pipeline replacement work using methods that are less intrusive to the community during construction, expedite project schedules, provide new infrastructure with an ultra-long design life, and save tax dollars by reducing overall project costs. - Pre-chlorinated pipe bursting: 2-inch through 16-inch water distribution replacement in residential neighborhoods - Compression Fit HDPE pipe lining: 16-inch through 128-inch water transmission and sewer force main replacement - Slip lining: 2-inch through 128-inch water transmission and sewer force main replacement The team is led by President Andy Mayer, who is a native of England and worked for British Gas at a time when they were first developing pipe bursting and CompressionFit. He was instrumental in the development and advancement of both methods. With millions of feet of static pipe bursting and CompressionFit experience, Murphy Pipelines has received numerous awards including 2021, 2019, 2018, 2015, 2014, 2005, 2003 Trenchless Project of the Year, CSX Rail Performance & Safety Award, APWA Environmental Project of the Year and Underground Construction Technology Association Most Valuable Professional (Andy Mayer).
- 网站
-
https://www.murphypipelines.com/
Murphy Pipeline Contractors的外部链接
- 所属行业
- 公用事业
- 规模
- 51-200 人
- 总部
- Jacksonville,FL
- 类型
- 私人持股
- 领域
- Pre-chlorinated Pipe Bursting、HDPE Pipe Lining、Static Pipe Bursting、Slip Lining、Water Main Replacement、Sewer Force Main、Trenchless Technology、Trenchless、HDPE pipe、Compression Fit HDPE pipe lining、Trenchless Water Line、Pipe Bursting、Sliplining、Design Build、Pipeline、Civil Engineering、Infrastructure、Pipelines、Pipe bursting、Pipe Lining和Design-Build
地点
Murphy Pipeline Contractors员工
-
Richard Crow
Director of Engineering and Special Projects
-
Todd Grafenauer
VP/Educational Director at Murphy Pipelines, Construction World NFT, Principal at 3rd Millennium Cleaning
-
Andy Mayer
President at Murphy pipelines and AJM Pipelines
-
Philip Larkin
Executive Level Strategy & Business Development Leader
动态
-
Operator views // water main components on a pre-chlorinated pipe bursting project in Florida ready to be installed. #waterinfrastructure
-
CompressionFit Q&A // Q: When the HDPE pipe is installed (both reduction and reversion) is the process natural or is forced reversion (with pressure) required? A: All natural. Since the HDPE pipe is not stressed beyond its yield strength during installation, the HDPE pipe will naturally revert after installation as tension is released. The pipe will revert until it forms a tight compression fit within the failing host pipe. #ASTMf3508
-
Small window ? Trenchless still fits #ValueInTrenchless
-
a massive undertaking that took a TEAM effort to achieve success ??
Ft. Lauderdale's 17 Directional Drills with 48” and 54” #HDPE This article in Trenchless Technology Magazine discusses Ft. Lauderdale's struggle with aging sewer infrastructure and the frequent pipe failures resulting in spillage of over 211 million gallons in just a single 2 month period. The project is part of the City’s program to replace all of its decaying cast iron and ductile iron sewer pipes due to the area’s corrosive high salt water table. The solution was to use #HDPE pipe that was installed via 17 Horizontal Directional Drilling #HDD sites and under 3 rivers. The City worked with Hazen and Sawyer (owner’s representative) and with the 2 MAB contractor members Murphy Pipeline Contractors and DAVID MANCINI & SONS, INC. to build this 7.5-mile force main. Click here to read the full article: https://ow.ly/UQkV50TCkLB FOLLOW PPI Municipal & Industrial Division on LinkedIn and visit our website to learn more about how #resilient and #reliable HDPE pipe connects us to a leak-free future: https://ow.ly/yqNN50TCl0G #plasticpipeconnects