PREFABRICATION

PREFABRICATION

Nowadays, more and more prefabrication have been applied on architecture market. Why so much prefabricated integral slabs have been popularized by compulsion?

Theoretically, prefabrication will be much more advanced and a universal standardized metric code units would be better applied globally in the future. But, there are diverse application results from difference places.

 “Whenever there's any doubt of engineering, there is no doubt.”

As the picture shows, the prefabricated composite panel is 60 mm thick, finished floor thickness will reach 140 mm.

图片无替代文字

These composite panels prefabricated, just like large patches, would be embedded in the slab from under. Although they would be connected with the upper reinforcing bars, but they cannot truly be integrated with cast - in - place concrete slab in the end.  

What more ironic is that like such assembled composite slabs would be demanded to reach seismic parameters of equality to the directly pouring slabs on the spot.

Ronnie Chang

Field Operations | Lead & Conduct Surveys | Survey Data Verification

5 年

Thanks for sharing

回复
Ivana Pazek

Emotional and Mental Health for Leaders / CSM, PMI-ACP, ICF PCC

5 年

What is the alternative Max Ren ? Your recommendation?

回复

要查看或添加评论,请登录

MAX REN的更多文章

  • PIPE JACKING via FOUNDATION PIT

    PIPE JACKING via FOUNDATION PIT

    This sewage conveying to be used DN1000 steel pipe jacking across under a river, so two foundation pits would…

    3 条评论
  • HOUSING PURCHASE

    HOUSING PURCHASE

    In real estate development, land grabs are a zero-sum game on account of land is a finite resource. When you win, it…

    3 条评论
  • UNEMPLOYMENT / TRANSFORMATION ON DOMESTIC PROPERTY INDUSTRY

    UNEMPLOYMENT / TRANSFORMATION ON DOMESTIC PROPERTY INDUSTRY

    In the post COVID-19, modern residential architecture in a city rarely surprises us anymore, and is no more than a…

    3 条评论
  • COMMERCIAL COMPLEX BUILDING

    COMMERCIAL COMPLEX BUILDING

    Humans have always been fascinated by height and always sought to escape the bonds of the gravity. Of the 10 completed…

    2 条评论
  • CONSTRUCTION AMID COVID—19

    CONSTRUCTION AMID COVID—19

    Often, what happens is that we project our own perceptions and insecurities onto the other person. We end up believe…

    2 条评论
  • URBANIZATION

    URBANIZATION

    URBANIZATION recently would be inevitable to becoming a sensitive topic along with deadly novel corona virus contagious…

    7 条评论
  • SPONGE CITY

    SPONGE CITY

    The irrationality of a thing is not an argument against it’s existence, rather, a condition of it. —Nietzsche As the…

    3 条评论
  • STRUCTURAL ANALYSIS

    STRUCTURAL ANALYSIS

    Structural analysis is the process by which the structural engineer determines the response of a structure to specified…

社区洞察

其他会员也浏览了