Ppr Brass Prefilter DSTHERM
Ppr Brass Pre-Filter Product:
Executive StandardQB/T 4143-2014Capacity3000 L/HModel DSTHERMWorking Temperature RangeMaximum: 70°C / 158°F
Minimum: 5°C / 41°FWorking PressureMaximum: 1.2 MPa
Minimum: 0.1 MPaDimensionsDN15 DN20 DN25WeightNet 1.0KG / Gross 1.2KGPre Filter body materialEuropean standard BrassSize of filter mesh30-60μm
Details Image
Application:
Pre-Filter For Drinking
More Details:
Brand NameDSTHERM / OEM availablePackage1 pc in one poly bag, 10-12 pcs in one white or brown box, 100-120pcs in brown carton, OEM availablePayment TermsT/T 30% in advance, 70% against of copy; L/C 30% in advance, 70% at sight; Western Union; PaypalPort of DepartureShanghai/ningboPlace of productionZhejiangProduction TimeOEM order 45 days of production including new moulds, Existing products only need 30 -35 days after order confirmationApplicationsThreaded On/Off Valves for Water, OilMain MaterialMS58; HPB57-3; HPB59-1; CW617N; CW611N; CZ132(DZR); CW602N(DZR);
Lead free brass C46500Size(1/2" DN15; 3/4" DN20; 1" DN25; ), S20*1/2F,S25*3/4F,S32*1F,S40*1-1/4F, S50*1-1/2F,S63*2FThreadedG (GB/T7307-2001) ; BSP (BS21-1957); BSP.F (BS-2779); BSP.T (BS-1957); NPT (GB/T12716-1991); PT (GB/T7306-2000); (R; Rc; Rp; NPS are available)M.O.Q.10 pieces which depends on production arrangement
Advantages
1) Fast Material Supply.
2) Every valve goes through a six-step QC process before delivery.
Material Control, Machining Quality Control, In-coming Material Inspection, Assembly Line Quality Control, Leakage Testing, Final Inspection Before Delivery.
3) 100% Leakage Test.
4) Strictly and perfect management in production.
5) Guarantee Quality In Competitive Price.
6) On-time Delivery.
7) Complete R&D facilities and Excellent team.
8) Annual R&D projects reach the number of 100.
9) Have rich experience and strong ability to develop new products.
QC:
· We promise to supply you high quality and durable goods for you.
· Our worker will check every accessory before hand-assembled.
· Our quality inspector will check every product one by one before packing.
· Regular checking on line from production in each workshop
Production step :
1) purchasing the material and forged the semi-products .
2) processing the semi-products in workshop .
3) assembling the goods .
4) testing the sealing in pressure and checking quality of the goods
5) package
6) deliveing the goods on time .
Package:
1) the package standard : standart export carton, box .
2) if customer has special requirement. it is available to provide the colorful package against the design of customer.