Power saving tips for #Constant #Temperature and #Humidity #Chambers
James Huang
Senior Lab Consultant in Haida International Equipment Co., Ltd. -> Batteries Tester | Plastic & Rubber Tester | Auto Spare Part Tester | Charging Piles Tester
1. Placement: The constant temperature and humidity test chamber should be placed in a cool and ventilated place, avoid direct sunlight, keep away from heat sources, and leave appropriate space on the left and right sides and back of the constant temperature and humidity test chamber when placing. Cooling. Because the high ambient temperature around the constant temperature and humidity test chamber will increase the power consumption of the test chamber.
2. After using the constant temperature and humidity test chamber for a period of time, some frost will be generated. If it cannot be tempered regularly, it will affect the cooling effect, and the power consumption will increase, and it may even damage the compressor. Therefore, whenever the thickness of the frost is seen to exceed 7 cm, defrosting should be performed.
3. Whenever you open the door, you will have cold air and heat intrusion, so you must run the compressor again. Therefore, when accessing the sample, it is necessary to minimize the number of door opening and door opening time, and to open and close the door faster, and the opening angle should be as small as possible.
4. Always pay attention to the constant temperature and humidity test chamber "bath", the surface of the compressor and condenser should be cleaned every two to three months, the more dust, the worse the heat dissipation effect, the greater the power consumption, cleaning Turn off the power and wipe it off with a damp cloth.