A civil engineer does many activities at the construction site and there are certain activities that are repetitive in nature. So, here are some points, tips, and tricks that a civil engineer should remember for faster calculations as well as quick solutions to construction site problems.

Points to Remember for Civil Site Engineer

Following are a few general points to remember for civil site engineers to make the construction work easier while maintaining the quality of construction.

  • Lapping is not allowed for the bars having diameters more than 36 mm.
  • Chair spacing maximum spacing is 1.00 m (or) 1 No per 1m2.
  • For dowels rod minimum of 12 mm diameter should be used.
  • Chairs minimum of 12 mm diameter bars to be used.
  • Longitudinal reinforcement is not less than 0.8% and more than 6% of gross C/S.
  • Minimum bars for a square column are 4 No’s and 6 No’s for circular columns.
  • Main bars in the slabs shall not be less than 8 mm (HYSD) or 10 mm (Plain bars) and the distributors not less than 8 mm and not more than 1/8 of slab thickness.
  • The minimum thickness of a slab is 125 mm.
  • Dimension tolerance for cubes + 2 mm.
  • Free fall of concrete is allowed a maximum of 1.50m.
  • Lap slices not be used for bars larger than 36 mm.
  • Water absorption of bricks should not be more than 15 %.
  • PH value of the water should not be less than 6.
  • The compressive strength of Bricks is 3.5 N / mm2.
  • In steel reinforcement binding wire required is 8 kg per MT.
  • In soil filling as per IS code, 3 samples should be taken for core cutting test for every 100m2.

No alt text provided for this image

Curing time of RCC Members for different types of cement:

Super Sulphate cement: 7 days Ordinary Portland cement OPC: 10 days Minerals & Admixture added cement: 14 days

De-Shuttering time of different RCC Members:

No alt text provided for this image

Cube samples required for different quantities of concrete:

No alt text provided for this image