Percentage of Condition-Based Maintenance
Percentage of Condition-Based Maintenance

Percentage of Condition-Based Maintenance

Percentage of Condition-Based Maintenance

The Percentage of Condition-Based Maintenance (CBM) is a metric used to evaluate the proportion of maintenance activities that are performed based on the actual condition of equipment rather than on a fixed schedule or time interval. This measurement reflects the extent to which an organization relies on real-time data and diagnostic tools to monitor equipment and systems, and to make informed decisions about when maintenance should be performed.

CBM is a proactive maintenance strategy that aims to prevent equipment failures and enhance operational efficiency by addressing potential issues before they result in downtime. The percentage is calculated by dividing the number of maintenance tasks performed under condition-based monitoring by the total number of maintenance tasks performed over a specific period, and then multiplying by 100 to express it as a percentage.

This metric helps organizations optimize their maintenance processes, reduce costs associated with unnecessary maintenance, and improve equipment longevity and reliability. It is particularly useful in industries where equipment failure can have significant operational or safety implications.


Benefits

1. Optimized Maintenance Scheduling

- Description: CBM allows maintenance to be scheduled based on the actual condition of equipment rather than at predetermined intervals. This approach ensures that maintenance is only performed when necessary, which can significantly reduce the downtime and operational disruptions typically associated with routine or scheduled maintenance.

- Impact: This leads to increased equipment availability and operational efficiency, as maintenance can be planned during off-peak times or when it will have the least impact on production.

2. Extended Equipment Lifespan

- Description: By monitoring equipment and performing maintenance based on specific needs rather than on a set schedule, CBM helps prevent the overuse of machinery which can degrade equipment faster. Regular monitoring detects problems before they become severe, reducing the likelihood of catastrophic failures.

- Impact: This proactive approach not only saves costs on repairs and replacements but also optimizes capital investment by extending the useful life of machinery and equipment.

3. Cost Efficiency

- Description: Although setting up CBM systems involves upfront investment in sensors and diagnostic tools, the long-term savings are significant. By avoiding unnecessary maintenance and preventing major breakdowns, organizations can significantly reduce maintenance costs.

- Impact: Reduced unexpected breakdowns and minimal unnecessary maintenance lead to lower overall maintenance costs and better allocation of resources.

Disadvantages

1. High Initial Investment

- Description: Implementing CBM requires significant upfront costs, including the purchase of advanced sensors, diagnostic tools, and data analysis systems. Additionally, integrating these technologies into existing systems can be complex and costly.

- Impact: The initial expense can be a barrier, particularly for smaller operations or industries where margins are tight, potentially delaying return on investment.

2. Specialized Skills Requirement

- Description: CBM relies heavily on sophisticated equipment and data analysis techniques, necessitating specialized skills for operation and interpretation. Finding and training staff with the necessary expertise or hiring new talent can be challenging and expensive.

- Impact: This can lead to increased operational costs and challenges in workforce management, as ongoing training and development become essential for maintaining the effectiveness of the CBM program.

3. Data Management Challenges

- Description: CBM generates large volumes of data that must be effectively managed and analyzed to be useful. This requires robust data management systems and can lead to issues related to data storage, privacy, and security.

- Impact: Without effective data management practices, the data collected can become overwhelming, potentially leading to missed maintenance opportunities or errors in analysis, which in turn can compromise equipment reliability and safety.


Step-by-step guide to help you implement CBM successfully

Step 1: Assess Current Maintenance Practices

- Objective: Understand and document your current maintenance processes, including what systems are maintained, how maintenance is performed, and the frequency of these activities.

- Action: Conduct audits and gather data from maintenance records to identify strengths and weaknesses in your existing approach.

Step 2: Define Goals and Objectives

- Objective: Set clear, measurable goals for what you hope to achieve with CBM (e.g., reduce downtime, extend equipment lifespan, decrease maintenance costs).

- Action: Collaborate with stakeholders to align these goals with overall business objectives.

Step 3: Identify Critical Equipment

- Objective: Determine which machines and systems would benefit most from CBM.

- Action: Prioritize equipment based on factors such as failure impact, repair cost, and criticality to production processes.

Step 4: Implement Monitoring Technology

- Objective: Equip critical machinery with sensors and data collection technology capable of real-time monitoring.

- Action:

- Research and select appropriate sensors (e.g., vibration sensors, temperature sensors, pressure sensors).

- Install sensors and ensure they are properly calibrated and integrated with data collection systems.

Step 5: Develop Data Collection and Analysis Systems

- Objective: Set up systems to collect, store, and analyze data from sensors.

- Action:

- Implement or upgrade IT infrastructure to handle large volumes of data.

- Choose or develop software for data analysis, possibly incorporating AI and machine learning for predictive analytics.

Step 6: Train Your Team

- Objective: Ensure that maintenance and operations staff are knowledgeable about CBM techniques and technologies.

- Action:

- Provide training on the operation and maintenance of new sensors and data analysis tools.

- Educate staff on interpreting data and making maintenance decisions based on analytical results.

Step 7: Integrate CBM into Maintenance Processes

- Objective: Seamlessly integrate CBM strategies with existing maintenance practices.

- Action:

- Develop protocols and workflows for responding to data insights and alerts.

- Adjust maintenance schedules and planning based on CBM findings.

Step 8: Pilot Test

- Objective: Validate the effectiveness of the CBM system on a small scale before full implementation.

- Action:

- Start with a pilot program focusing on a select group of equipment.

- Monitor results, make adjustments, and document any improvements in maintenance outcomes.

Step 9: Full Scale Implementation

- Objective: Roll out the fully tested CBM system across all identified critical equipment.

- Action:

- Use insights gained from the pilot to refine processes.

- Gradually expand the scope of CBM to include additional equipment based on priority and benefit analysis.

Step 10: Continual Improvement and Adjustment

- Objective: Continuously improve the CBM system based on operational feedback and new technological advancements.

- Action:

- Regularly review system performance and make adjustments as necessary.

- Stay updated on new sensors and data analytical tools that could enhance the CBM program.

Step 11: Measure Success

- Objective: Evaluate the success of the CBM implementation against the initial goals set.

- Action:

- Analyze maintenance logs, downtime records, and financial reports to assess the impact of CBM.

- Adjust goals as necessary to align with evolving business objectives and technological capabilities.


Example

Step 1: Determine Total Maintenance Actions

First, you need to gather data on the total number of maintenance actions performed on the filling machine over a given period, such as a year. This includes all types of maintenance:

- Preventive Maintenance (PM)

- Corrective Maintenance (CM)

- Condition-Based Maintenance (CBM)

- Any other maintenance activities

Let’s say you have the following annual maintenance actions for the filling machine:

- Total Preventive Maintenance actions: 24 (bi-monthly schedule)

- Total Corrective Maintenance actions due to failures: 5

- Total Condition-Based Maintenance actions: 15

Total Maintenance Actions = PM + CM + CBM

Total Maintenance Actions = 24 + 5 + 15

Total Maintenance Actions = 44

Step 2: Determine Condition-Based Maintenance Actions

You need to count the number of maintenance actions that were specifically taken as a result of condition monitoring. Let's say, over the same period, you performed the following CBM actions:

- Vibration analysis leading to maintenance: 7

- Infrared thermography leading to maintenance: 3

- Acoustic monitoring (e.g., for bearing wear) leading to maintenance: 2

- Lubrication analysis leading to maintenance: 3

Total CBM Actions = 7 + 3 + 2 + 3

Total CBM Actions = 15

Step 3: Calculate Percentage of CBM

Now, calculate the percentage of maintenance actions that were CBM-related.

Percentage of CBM = (Total CBM Actions / Total Maintenance Actions) x 100

Percentage of CBM = (15 / 44) x 100

Percentage of CBM = 34.09%

Result:

So, in this example, the Percentage of Condition-Based Maintenance actions performed on the filling machine is approximately 34.09%.

This metric can help you understand the extent to which you are utilizing CBM in your maintenance program. A higher percentage indicates a more proactive approach, with maintenance being performed based on the actual condition of the equipment rather than on a fixed schedule or after a failure has occurred.


?? Seek assistance for hard-to-find spare parts, service providers, maintenance issues, and more on our form. Your queries will be showcased to our entire community in the next newsletter, where experts and peers can provide valuable insights and solutions ??

??Access the form by clicking here


Machine of the day

Filling Machine

Filling Machine

Description

A filling machine typically features several key components:

- Hopper or Tank: Where the product is stored before being dispensed. For liquid products, this might be a heated or agitated tank to maintain fluidity.

- Conveyor System: Transports the packaging under the filling nozzles. The speed and spacing can often be adjusted to accommodate different packaging sizes and filling speeds.

- Filling Nozzles: These are precision-engineered to deliver the right amount of product. They can vary greatly, from simple open nozzles for non-viscous liquids to sophisticated valve nozzles for handling thick creams or gels.

- Metering System: Ensures the correct amount of product is dispensed each time. This could be volume-based, weight-based, or count-based for solid items.

- Control Panel: Allows operators to set and monitor various parameters such as filling speed, volume per package, and overall production throughput.

Application

Filling machines in food companies are used for a wide range of applications, including:

- Beverage Filling: For bottling water, juices, soft drinks, and alcoholic beverages.

- Dairy Product Filling: For packaging milk, yogurt, and cream.

- Sauces and Dressings: Filling bottles or jars with sauces, dressings, and condiments.

- Snack and Dry Goods: Dispensing snacks, cereals, nuts, and other dry products into bags or containers.

- Frozen Foods: Filling packages with frozen items such as vegetables, fruits, and pre-cooked meals.


The most frequent breakdowns :

1. Nozzle Malfunctions:

- Clogging due to product build-up or debris

- Dripping caused by worn seals or improper shut-off

- Inconsistent filling levels due to faulty valves or calibration errors

2. Conveyor Issues:

- Belt misalignment or slippage affecting the smooth transportation of containers

- Conveyor motor failures

- Sensor failures that result in incorrect bottle positioning

3. Pump Failures:

- Wear and tear leading to reduced pump efficiency or failure

- Seal leaks causing product loss and contamination

- Air entrapment in the pump reducing accuracy of fill

4. Control System Errors:

- PLC (Programmable Logic Controller) malfunctions

- Calibration drifts in sensors leading to inaccurate fills

- Software glitches or errors in the machine’s HMI (Human Machine Interface)

5. Sealing Problems:

- Incomplete or inconsistent sealing of containers

- Heat sealer not reaching correct temperature

- Mechanical failure of sealing components

6. Electrical Issues:

- Short circuits or blown fuses

- Wiring issues leading to erratic machine behavior

- Electrical component failures like solenoids or relays

7. Mechanical Wear and Tear:

- Worn out bearings and gears leading to poor machine function

- Drive train problems affecting the operation of moving parts

- Physical damage to the machine frame or components affecting alignment

8. Product Flow Problems:

- Variations in product viscosity affecting the fill rate

- Foaming of the product leading to inconsistent fills

- Blockages in product pathway

9. Material Handling Difficulties:

- Problems with the hopper or bowl feeder leading to an inconsistent supply of containers or caps

- Vacuum pick-up issues for placing caps or other sealing mechanisms

10. Safety Switch Errors:

- Emergency stops being triggered accidentally or failing to trigger when needed

- Door safety interlocks malfunctioning, leading to unsafe operation

11. Air Pressure Variations:

- Inconsistent air pressure for pneumatic components leading to erratic operation

- Air leaks in the system


?? Seek assistance for hard-to-find spare parts, service providers, maintenance issues, and more on our form. Your queries will be showcased to our entire community in the next newsletter, where experts and peers can provide valuable insights and solutions ??

??Access the form by clicking here


??If you are interested in promoting your machines, spare parts or services in this newsletter, please do not hesitate to send us a message on our page: https://www.dhirubhai.net/company/engineering-news-learning

Abbas A Garyeazon

Human Resources Generalist at LECO

7 个月

I think

回复
S SAIDHA MIYAN

Aspiring Corporate Director / Management Consultant / Corporate Leader

7 个月

Thanks for sharing, an informative-insightful article, & Best wishes, Engineering Group. Syed Awees Aspiring Analyst.

回复
Chithra Gnanasundaram

Buisness development manager at Swaraj Equipment

7 个月

Thank you for

要查看或添加评论,请登录

社区洞察

其他会员也浏览了