This year, the TILT team are working with architects, builders, manufacturers and other technical service teams to create the UTS Central reading room – an FJMT Architects designed project. One of the key collaborators that TILT is working closely with is Paul Wintour from Parametric Monkey. We sat down with Paul to better understand parametric modelling and digital fabrication and discuss his part in this exciting project.

What is Parametric Modelling and Digital Fabrication?

Parametric modelling is the creation of a digital model that helps improve the way buildings are designed and built. When combined with design-to-fabrication workflows, it closes the gap between the digital model and the physical construction process. This entire process is known as digital fabrication.

As Paul explains it, an algorithm is written based on a set of rules. This algorithm, known as a ‘script’, is created based on a rigorous design methodology, and shows how a building, based on these rules, will look. Once the algorithm has been written, the value of the variables can be adjusted and those changes will be reflected in the model of the building. Using parametric modelling, Paul explains, “accelerates traditionally complex modelling processes and allows exploration of ideas to move on quickly if a design is not going to work.”

Above: Automation of 2D cutting plans of folded aluminium sheet metal using Grasshopper.

How does it help?

For this particular project, parametric modelling serves as a strong link between the architect and the TILT team. FJMT are renowned for their geometrically interesting building forms and TILT are experts in industrial manufacturing, bringing the architects’ designs to life.

The UTS Central project has a layer of geometric complexity with many non-standard elements that would take months of man hours to design, document and manufacture. Parametric modelling speeds up the process to enable a faster construction process, minimise resources, and use material-specific design solutions.

The sunshades on the UTS Central reading room are geometrically derived via a set of rules and the parametric modelling process further refines the design to include detailed elements such as the fixings, material joints, and motorised components. The script automatically propagated the inherent rules to all of the other sunshade bays within the design. This process now takes weeks instead of months and by incorporating the architect’s original script, there is no loss of design intelligence - maintaining the design intent, which is always TILT’s goal.

Parametric Monkey

As a digital design consultancy, Parametric Monkey allows different companies both big and small, to access digital design expertise that may otherwise be unavailable or difficult to access. As a registered architect specialising in computational design, Paul identified limits in digital design literacy within the architectural industry and launched Parametric Monkey in February 2018 to address this issue. Now working with architects, engineers, manufacturers, developers and governments, Parametric Monkey focuses on bridging the gap between buildings and technology.

TILT worked in partnership with Parametric Monkey on the design feasibility stage of the UTS Central project to assist with ensuring the architect’s vision could come to fruition.

Above: Operable louvre animation in Grasshopper for the UTS Central project

Parametric Modelling Outcomes

The outcomes of the modelling process benefit all stakeholders of a project such as this.

For the architect, their design intelligence is upheld. Although design development is passed on to the TILT team for manufacture, the design intent is maintained. For the client, a Building Information Model (BIM) is supplied which outlines all specifications of the model including manufacturer information, warranties, user manuals and other data allowing efficient facilities management after the building has been completed.

For TILT, the modelling process provides sheet metal cutting plans that are then checked and verified before each element is manufactured. The architect’s origami-like design is automatically ‘unfolded’, generating 2D shop drawings that include dimensions and annotations, with geometric accuracy, providing confidence the unique form and pattern can be manufactured to design specifications.

Utilising the latest technology services such as those provided by Parametric Monkey as well as proven design methodologies and processes means creative freedom is upheld and, as Paul Wintour says, helps “not just to do things better, but to do better things”.

 

Matt Bishop

Engineer of the Future AEC Firm | Strategy & Systems for Smarter Interiors | PRENGUIN + Brevity

5 年
回复
David Russell

Senior Estimator

6 年

Great work Tim and the Team

回复
Shane Rolton

Managing Director at Wysiwyg 3D Pty Ltd, 3D Laser Scanning, 3D Measurement, 3D Inspection and Analysis

6 年

Precision manufacture within the construction industry! A few challenges ahead!

回复
Noel Taloni

Department of Industry, Science and Resources

6 年

It was a pleasure to meet Tim today. He and his team are impressive.

回复

要查看或添加评论,请登录

Tim Phillips的更多文章

  • The key to installation is maintaining design intent…and planning

    The key to installation is maintaining design intent…and planning

    Installation is the third step in TILT’s design-supply-install-maintain approach, and we are currently in this phase…

    1 条评论
  • What’s Involved in Production to Bring Design Concepts to Life?

    What’s Involved in Production to Bring Design Concepts to Life?

    Although the manufacturing of components is physically one of the later phases of a design and construct project, as a…

    3 条评论
  • Why the Detailed Design phase is so important to an architect

    Why the Detailed Design phase is so important to an architect

    TILT Industrial Design collaborates with architects in a whole range of ways, including on unique architectural…

    1 条评论
  • Lessons for all businesses working in China

    Lessons for all businesses working in China

    I’m always happy to share insights and learnings with anyone interested in taking their business to an international…

    1 条评论
  • Managing Design Risk with Prototyping

    Managing Design Risk with Prototyping

    Many of the projects TILT work on require a one-off site-specific design solution, so the opportunity to create a…

    2 条评论
  • ‘Design Study’ : Bridging the gap between Concept and Engagement

    ‘Design Study’ : Bridging the gap between Concept and Engagement

    In TILT’s work as industrial designers, the team are regularly tasked with bringing concepts to life. We meet with…

  • Singapore Reflections

    Singapore Reflections

    The recent trip to Singapore for the 3-day BEX Asia tradeshow was a fantastic opportunity to expand focus from China…

    1 条评论
  • Build Eco Xpo (BEX) Asia – Singapore 2018

    Build Eco Xpo (BEX) Asia – Singapore 2018

    I’ve written previously about our collaboration with Dominion House to explore international markets for TILT. Our next…

    3 条评论
  • Bringing Concepts to Life

    Bringing Concepts to Life

    Much of the work TILT Industrial Design does – whether with artists, engineers or architects – involves the team being…

    2 条评论
  • Learnings from Chongqing

    Learnings from Chongqing

    The INDUSTRIAL + ASIA 2018 program that TILT has invested in is a market entry strategy developed by Dominion House for…

    2 条评论

社区洞察

其他会员也浏览了