OBS , ORGANIZATION BREAK DOWN STRUCTURE

OBS , ORGANIZATION BREAK DOWN STRUCTURE

reflects the company’s organization as integrated with a particular PMO to support a specific project.

Functional Organizational Structure is very rigid . rigid . Each functional group has a manager over the group’s function, such as engineering services or information technology

Matrix Organization is one in which an individual in a functional organization is assigned or matrixed to another organization ,

Project Organization is one in which a project is authorized to proceed , given a budget to allocate expenditures , and has

要查看或添加评论,请登录

Mohamed Shams的更多文章

  • COST ESTIMATE

    COST ESTIMATE

    Cost estimating is the iterative predictive process used to quantify , cost , and price the resources required by a…

  • asset Management

    asset Management

    The lifecycle of a strategic asset can be summarized by the following five (5) stages: 1- Ideation – Determine an…

  • RISK RESPONCES

    RISK RESPONCES

    for threats : 1-Avoid: Involves eliminating either the probability or impact. This can be done by either clarifying…

  • Important Terms In Cost Management

    Important Terms In Cost Management

    Common language terms and their symbols for time value of money problems are : P = present value F = future value A =…

  • Why Construction Projects Failed ???

    Why Construction Projects Failed ???

    According To AACE Practice : 1-Failure of the project team to understand and fully comprehend the scope of the project…

    1 条评论
  • SUCCESS INDEX (SI)

    SUCCESS INDEX (SI)

    SUCCESS INDEX (SI) Numerical evaluation of total organizational performance is possible using the Success Index(SI). It…

  • Toxic Conflict between project manager and cost engineer

    Toxic Conflict between project manager and cost engineer

    Conflict between these roles can reach Project Failure . .

  • VALUE ENGINEERING

    VALUE ENGINEERING

    Steps: 1- An organized creative approach to cost reduction. 2- Targets function versus technique.

  • BOE : BASIS OF ESTIMATE

    BOE : BASIS OF ESTIMATE

    The BOE clearly define the design basis, planning basis, cost basis, and risk basis of the estimate . 1-Design Basis:…

    2 条评论
  • Conceptual Estimating

    Conceptual Estimating

    Conceptual estimating methods are typically used for Class 5 and Class 4 (and sometimes for Class 3) estimates. these…