Newest KR800-MAX will leave our facility.

Newest KR800-MAX will leave our facility.

Just the final test were done of our last KR800-MAX. The machine will leave our facility next week, heading middle east. The maximum output of the machine reached more than 1.300 kg/hr. We produced pipes DN/ID1065mm (42"), SN8, 1 bar inside pressure, including socket and spigot; PE100 with an inspection friendly coextruded PE100 inner surface. The heart of the line was a Krauss-Maffei single screw estruder 125x36D. The extrusion time was only 22min. A complete report will be publihsed in our online-magazin "Improfil" next week. For a free copy contact me or register at www.krah.net.

要查看或添加评论,请登录

Dr. Alexander Krah的更多文章

  • Performing and surviving in times of crisis - Installation without being on site: Krah VA

    Performing and surviving in times of crisis - Installation without being on site: Krah VA

    How Krah is doing the installation and commissioning abroad without being on site – KRAH VA Today, we live the life of…

    3 条评论
  • Thoughts are free

    Thoughts are free

    In the old German folk song “Die Gedanken sind frei” (Thoughts are free) they sing about freedom of thought. This…

    1 条评论
  • Krah in times of Corona

    Krah in times of Corona

    On the 20th of April, Germany has loosened its strict Corona measures, which were taken in the last few weeks…

    11 条评论
  • Free job - we are looking for an editor!

    Free job - we are looking for an editor!

    Die Krah Gruppe ist ein international agierendes Maschinenbauunternehmen, mit Schwerpunkt auf den Bau und Vertrieb von…

  • Insect mortality in Europe

    Insect mortality in Europe

    and how the Krah Group is working against it Since 1989 the mass of insects in Europe has decreased up to 76%, Bees…

    4 条评论
  • A better solution than recycling !

    A better solution than recycling !

    The spring reaches Europe and Krah-Pipes got a new "little" application. Instead of recycling we are using pipes (not…

    1 条评论
  • A great opportunity...

    A great opportunity...

    ..

    2 条评论
  • This is the "other" solution of Krah Pipes

    This is the "other" solution of Krah Pipes

    Again I found (during my actual trip) concrete pipes in a length of 1m. The handling time and costs are very high.

    3 条评论
  • Sinkholes - with Krah-Pipes repaired.

    Sinkholes - with Krah-Pipes repaired.

    Sinkholes - a big issue. We will have an extensive report in our next IMPROFIL magazin.

  • Last post of the year - merry Christmas !

    Last post of the year - merry Christmas !

    I wish all my friends a merry and peacful Christmas and a good and safe new start in the year 2018. The last containers…

    2 条评论

社区洞察

其他会员也浏览了