New Construction Checklist - 101
Joseph V. Scorese, Nationwide Direct Private Lender

New Construction Checklist - 101

New Construction Checklist - 101

?

Creating a checklist for new construction is a smart way to stay organized and ensure that every aspect of the project is accounted for. Here's a comprehensive checklist you can use:

?

Initial Planning:

Determine the purpose of the construction (residential, commercial, industrial, etc.).

Establish a budget.

Hire an architect or designer if necessary.

Obtain necessary permits and approvals from local authorities.

Site Preparation:

Clear the construction site.

Grade the land if needed.

Install temporary utilities (electricity, water, etc.).

Erosion control measures if required.

?

Foundation:

Excavate and pour foundation footings.

Install foundation walls.

Waterproofing and insulation.

Pour concrete slab or basement floor.

Structural Framing:

Frame the walls, floors, and roof.

Install trusses or rafters.

Sheath the exterior walls.

Install windows and exterior doors.

?

Roofing:

Install roofing materials (shingles, tiles, metal sheets, etc.).

Flashing and gutter installation.

Exterior Finishes:

Siding installation.

Exterior trim work.

Painting or staining.

Interior Rough-Ins:

Plumbing rough-in (pipes, drains, vents).

Electrical rough-in (wiring, outlets, switches).

HVAC rough-in (ductwork, vents, units).

Insulation and Drywall:

Install insulation in walls, floors, and attic.

Hang drywall.

Tape, mud, and sand drywall seams.

?

Interior Finishes:

Install interior doors and trim.

Paint walls and ceilings.

Install flooring (carpet, hardwood, tile, etc.).

Install cabinets and countertops.

Final Fixtures and Appliances:

Install plumbing fixtures (sinks, toilets, showers, etc.).

Install light fixtures and outlets.

Install appliances (oven, refrigerator, dishwasher, etc.).

?

Final Touches:

Clean the construction site.

Landscaping and exterior grading.

Final inspections by building authorities.

Obtain occupancy permit.

?

Post-Construction:

Create a maintenance schedule.

Address any warranty issues.

Obtain final approvals and certificates.

?

Remember, this checklist may vary depending on the type and scale of construction. Adjust it accordingly to fit your specific project requirements.