NAT Track: Summary of 12 November 2015 Changes
??Santosh Venkata ADX??
Experienced Aviation Ops Manager | Expert in General Aviation & Luxury Travel | UHNW Specialist | Compliance & Vendor Relations Expert | UK-USA-Schengen-Canada MEV | FAA Dispatch License holder | Let’s connect ??
NAT Track: Summary of 12 November 2015 Changes
- Officially designated as a ‘Trial’ – but RLAT Tracks are available to all operators meeting the existing airspace requirements and the RLAT Com/Nav/Surv requirements below – no need for application to any authority.
- Each day, for both east and westbound tracks, a new “RLAT Track” will be inserted at half latitudes between two of the core tracks.
- The RLAT Track will have half-degree latitude separation with the two tracks beside it, in other words, it will be spaced 30nm from the tracks to the north and south of it.
- This has the effect of making three “RLAT” or “RlatSM” tracks (Reduced Lateral Separation Minima).
- A series of new Oceanic Entry Points (OEP’s) are introduced.
- The North American Route (NAR) structure is amended to match the new OEP’s.
The key changes are: a reduction in separation to ‘half-track’ compared to the existing structure, introduction of 24 new Oceanic Entry Points (OEP’s), and some procedural changes. These will affect all operators on the North Atlantic.
Airspace Affected: Shanwick and Gander OCA’s, and adjoining domestic airspace.
Credit: FSB
Inbound Sales Representative at AMANI TRAVEL & TOURISM
3 年??
Experienced Aviation Ops Manager | Expert in General Aviation & Luxury Travel | UHNW Specialist | Compliance & Vendor Relations Expert | UK-USA-Schengen-Canada MEV | FAA Dispatch License holder | Let’s connect ??
9 年That's right Zaid. 16NOV?The planned implementation of reduced separation in the Organised Track System (OTS) has been postponed. During final testing, a software issued was identified by ATC, and as a result the previous track structure remains unchanged. New waypoints introduced on 12NOV are useable. A revised implementation date is expected to be announced soon.
Flight Dispatch Officer | Flight Dispatcher | Top 100 Aerospace & Aviation Professional to Follow on Linkedin 2022
9 年No prob..Thanks for an informative article.However, RLat tracks have yet to be issued..it was supposed to start on 12th but no track have been issued till today.
Executive Director, Business Aviation Concepts. Captain, Line Training Captain Bombardier Challenger CL650 / CL605 / CL604. WealthBriefing Swiss Awards 2022 Winner - Best Lifestyle Consultancy
9 年Excellent job Santosh getting this information out. Well done!
Experienced Aviation Ops Manager | Expert in General Aviation & Luxury Travel | UHNW Specialist | Compliance & Vendor Relations Expert | UK-USA-Schengen-Canada MEV | FAA Dispatch License holder | Let’s connect ??
9 年Hi Zaid you are right. I checked cross-checked the NAT Ops bulletin. It says The 25 NM lateral separation minimum will be implemented by applying ? degree track spacing between three core NAT Organized Track System (OTS) tracks. 25 NM lateral separation will be applied between flight level (FL) 350-390 (inclusive). I stand corrected. Thanks for that.