MOST IMPORTANT ?15 POINTS TO BE CONSIDERED DURING PLASTERING....
Pavithra K R
Diploma civil engineer | diploma in quantity surveying |3d animator|licensed supervisor B| Draughtsman cum site engineer |
1.????? BRICK WORK SHOULD BE CURED FOR 7 DAYS
2.????? BRICK WORK SHOULD BE WATERED BEFORE PLASTERING.
3.????? AREA TO BE PLASTER SHOULD BE CLEANED (IN CASE OF ANY PARTICLES OF BRICK, DUST ETC.)
4.????? A TILE PIECE CAN BE FIT WITH CEMENT MORTAR TO CHECK LEVEL.
5.????? CONCRETE WALL SHOULD BE CHIPPED SLIGHTLY BEFORE PLASTERING (HACKED BY CHISEL) FOR PERFECT BOND.
6.????? CEMENT USED FOR PLASTERING SHOULD BE WITHIN 3 MONTHS FROM MANUFACTURE.
7.????? P SAND SILT CONTENT SHOULD NOT EXCEED 6%.
8.????? MIX RATIO FOR CEILING – 1:3
9.????? MIX RATIO FOR WALLS – 1:4 OR 1:5
10.?? IF PLASTERING THICKNESS EXCEEDS ?15 MM IT WILL AFFECT THE STRENGTH.
11.?? PROPER LIGHTING SHOULD BE AVAILABLE OTHERWISE WE CANNOT KNOW THE LEVEL DIFFERENCE.
12.?? IF GROOVES ARE PROVIDED IT SHOULD BE DONE BEFORE IT DRIES
13.?? PLASTERED AREA SHOULD BE CURED ATLEAST 10 DAYS.
14.?? THE PLASTERED MIX SHOULD BE CONSUMED WITHIN 1 HOUR.
15.?? OUTSIDE AREAS ESPECIALLY FOR SUNSHADE WATER CUTTINGS SHOULD BE PROVIDED USING PIPE TO PREVENT DAMAGE USING RAINWATER.