Mongolia: First Utility-Scale Energy Storage Project

Mongolia: First Utility-Scale Energy Storage Project

The First Utility-Scale Energy Storage Project aims to install a large-scale advanced battery energy storage system (BESS) in Mongolia’s Central Energy System (CES) grid. Which is to absorb curtailed renewable energy electricity and smoothen fluctuations caused by the intermittency of renewable energy.

Background of the Project

The project will expand the system’s capacity to connect additional renewable energy supply and meet the growing power demand in the CES grid. Of which is to meet the Government of Mongolia’s long-term renewable energy target by 2030.

Project Impact:?Renewable energy capacity increased to 20% of total generation capacity by 2023 and 30% by 2030.

Project Outcome:?Renewable electricity penetration increased.

On successful completion, the project will supply 58.5 gigawatt-hours of clean peaking power annually. And support the integration of an additional 859 gigawatt-hours of renewable electricity into the CES grid annually. Thereby avoiding 842,039 tons of carbon dioxide emissions yearly by 2025.

No alt text provided for this image
(Location of the Project Site, From Sources: Environmental Monitoring Report Q2_2021_BESS Project)

80MW/200MWh BESS Project Launch

(4th Aug 2022)?The groundbreaking ceremony for the 80MW/200MWh BESS EPC project was held in the presence of Mongolian Prime Minister Mr.L.Oyun-Erdene, Minister of Energy Mr.N.Tavinbekh, Members of Mongolian parliament, the CEO of National Dispatching Center Mr.B. Baljinnyam, ADB representatives, etc. As well as delegates from ZTT Group, the EPC Contractor of this project.

No alt text provided for this image
No alt text provided for this image

Key Products of ZTT Battery Container

The battery container is 40 feet across, has a capacity of 3.634MWh, and weighs 45 tonnes (over 65% of the battery weight). And the DC side voltage is 1500V, has an internal battery temperature difference of <8 degrees, and an IP54 protection class. Key internal components include HVAC, Current collection, BMS, Battery clusters, Combustible detectors, Combustible exhaust, Extinguishant, and Water interface.

No alt text provided for this image
(ZTT Battery Container Assembly Site, ready for delivery.)

Highlight Environmental Adaptation

In terms of environmental adaptability, the air conditioners are precisely selected and configured according to the heat generation characteristics of the batteries and based on the heat calculation formula summarised by ZTT technical team. For the Mongolian project, we selected two 25kW cooling and 12kW heating air conditioners. Which can cool down to 25 degrees in 4 hours under extremely high-temperature conditions and heat up to 5-10 degrees in 26 hours under extremely low-temperature conditions. Thus meeting the temperature control requirements of the battery compartment under different environmental conditions.

The BESS will be resilient to Mongolia’s extremely cold climate and equipped with a battery energy management system enabling it to be charged entirely by renewable electricity. This will then discharge clean electricity to supply peaking power in the central energy system grid. The project will also provide a regulation reserve to integrate additional renewable energy capacity in the transmission grid.

No alt text provided for this image
(Mongolia Project 3D Rendering)

  • Installed Capacity:?80MW
  • Located:?Western Ulaanbaatar, Mongolia
  • Duration:?2hrs
  • Grid:?Secured
  • Land:?Approx. 29,200m2 secured
  • Zoning:?Confirmed
  • Targeted COD:?End-2023

About Mongolia’s Rich Renewable Energy Potential

In Mongolia, the energy sector is dominated by coal, which contributes about 80% of the total primary energy supply.

In 2018, coal-fired combined heat and power plants contributed to 93% of total power generation in the electricity grid. Mongolia’s rich renewable energy potential – such as wind and solar – is about to be equivalent to 2,600 gigawatts, which could fully meet the country’s future power demand. However, this rich potential has not been realized. The government aims to increase the share of renewable energy in total installed capacity from about 12% in 2018 to 20% by 2023 and 30% by 2030, in line with the State Policy on Energy, 2015 – 2030.

About ZTT New Energy

ZTT started on Optical Fiber Communications in 1992, accessed Smart Grid in 2002, and commenced work on the Renewable Energy field in 2012. With over 30 years of sustainable innovation, ZTT helps make a wide variety of products across industries. Ever since it first started developing the Lithium-ion battery and BESS, ZTT has expanded a new era of focusing on power delivery and energy storage optimization.

Insist on technological innovation and respond to green double carbon. ZTT?New Energy will continue to move forward with the industry and witness the development and future of energy storage.

> Feel free also to contact us for more information: [email protected]

> Keep yourself up-to-date on Supercapacitors?News, Trends, Applications, and more with our?LinkedIn Page.

> For more information about our Supercapacitors, also visit our?product page.

Allen Yu

Senior Sales Manager in BYD Energy Storage|Utility Scale Battery Energy Storage System|BESS|ESS|PV Solar, Wind, Power Plant|Renewable Energy

1 年

welcome to talk about utiltiy scale BESS cooperation with BYD Energy Storage

回复
Kiara Shah

Associate Researcher

1 年

Impressive progress by Jade Gas Holdings at the TTCBM Project in Mongolia's south Gobi region! The confirmation of highest measured permeability at Red Lake and the successful gassy coal intersections at Red Lake-13 and Red Lake-14 are great indicators for the upcoming Pilot Production program. Exciting times ahead for clean energy development in Mongolia.

要查看或添加评论,请登录

社区洞察

其他会员也浏览了