The Modular Answer that works: FastTrack by Stubbe's

The Modular Answer that works: FastTrack by Stubbe's

In light of recent news?closure of a modular plant?in Kitchener due to development costs and government overregulation, it’s clear that the construction industry is facing significant challenges. This situation underscores the need for innovative solutions that can mitigate such issues and pave the way for more efficient, cost-effective construction methods.?

At Stubbe's Precast, we understand these challenges and have developed the FastTrack?system which incorporates Modular design and Traditional Construction. ?As a manufacturer and constructer we have the benefits of understanding both worlds.? Repeatability and Standardization drives efficiency in manufacturing resulting in lower cost.? The construction industry has never truly embraced these ideas.??

We met with a group of developers and architects to discuss what is important to them and the people that buy or live in their buildings.? ?We compiled their feedback and started designing a catalog of studios, 1-bed, 1-bed plus den, 2-bed, and 3-bed units, including those that work around stairs and elevator shafts.? These units are completely designed with room sizes, mechanical, electrical, millwork, etc.? Using our manufacturing mindset, all units use the exact same kitchen, and all units use 2 different bathroom vanities.??

Stubbe’s scope includes architectural design, engineering, foundations, precast supply,?and pre-installed windows.? The Construction Manager or Developer then takes over the remainder of the construction scope utilizing our standardized design. ??

Here’s why FastTrack stands out:?

1. Speed and Efficiency: The FastTrack system significantly reduces construction time by integrating design, manufacturing, and installation processes. This streamlined approach ensures projects are completed faster without compromising quality.? Since we designed the buildings maximizing on the capabilities of all the product we can drive down cost per sqft.? On the precast scope we are 10-15% cheaper then the best laid out Total Precast buildings we have built, using the same unit rates. This is all just due to maximizing product efficiency and cutting waste.? Other trades will see these same benefits which will continue to drive costs down.

?2. Cost-Effectiveness: By minimizing on-site labor and reducing the time spent on construction, the FastTrack system helps to control costs. This is crucial in an industry where budget overruns and delays are common.

?3. Quality and Durability: Our precast concrete components are manufactured in a controlled environment, ensuring consistent quality and durability. This results in structures that are not only robust but also require less maintenance over time.

?4. Flexibility in Design: The FastTrack system offers unparalleled flexibility, allowing for a wide range of architectural styles and building types.? The units layouts are locked but you can change finishes and use your design creativity on building fa?ade and common spaces like lobbies halls and amenities.

?5. Sustainability: Environmental considerations are at the forefront of our approach. The FastTrack system uses sustainable materials and processes, reducing the environmental impact of construction projects.?Fast Track can achieve 40% better efficiency then the current Ontario Building Code.? This helps you qualify for CMHC financing when building rentals.

?6. Compliance and Regulation: Navigating government regulations can be challenging. The FastTrack system is designed to meet or exceed industry standards and regulations, making it easier for developers to gain approval and move forward with their projects.? It works within the current framework of building codes and construction norms. It is designed like a 5D modular project but allows local or your preferred trades to complete the work for you.? This allows for competitive bidding on these scopes to ensure you are getting good pricing.

?As the construction industry evolves, it’s crucial to embrace innovative solutions that address its inherent challenges. The closure of the Z Modular factory highlights the need for alternatives that are not only efficient but also resilient in the face of regulatory and economic pressures.

?At Stubbe's Precast, we believe the FastTrack system is the future of construction. By offering a faster, more cost-effective, and higher-quality alternative to traditional modular homes, we are helping to build a more sustainable and resilient industry.

?Explore more about the FastTrack system and how it can revolutionize your next project at buildfasttrack.com ?or reach out to us at [email protected] ?or call us at 519-424-2183.

?