The main objective of this article is to emphasize the minimum release levels required for a seamless one-step conversion from SAP ERP 6.0 to SAP S/4HANA 2022.

For a one-step system conversion to SAP S/4HANA 2022, your SAP ERP 6.0 system should be on EHP0 to EHP8. If your system is on a lower release, a two-step process is necessary. In such cases, it is recommended to upgrade to SAP ECC 6.0 with the latest DMO, including Unicode migration, and then proceed with the system conversion to SAP S/4HANA 2022.

No alt text provided for this image

It's essential to note that SAP S/4HANA operates exclusively on the SAP HANA database. However, if your source SAP ERP system is currently using another database (AnyDB), there's no need to worry. You can still perform the conversion using the Software Update Manager (SUM) with the database migration option (DMO) to seamlessly migrate from AnyDB to SAP HANA in a single step.

Similarly, if your source SAP ERP system is already running on the SAP HANA database (SAP Suite on HANA), you can directly carry out the conversion using SUM without the DMO option.

Therefore, the type of database being used is not a hindrance to a one-step conversion. You have the flexibility to migrate from AnyDB to SAP HANA during the conversion process to SAP S/4HANA 2022.

Minimum Pre-requisite

Below ECC 6.0 minimum component sp level below for start SUM DMO.

SAP ERP 6.0 or higher (for example EHP1, EHP2, EHP3)

Systems based on SAP NetWeaver 7.0 (for example SAP ERP 6.0) need at least SP17 for software componentSAP_BASIS and SP19 for software component SAP_BW

Systems as part of SAP Business Suite 7 or higher (SAP ERP 6.0 EHP4, SAP CRM 7.0, SAP SRM 7.0, SAP SCM 7.0)

SAP SCM 7.0 (or higher)

Additional limitation for SCM systems with integrated liveCache: For the migration of an SCM liveCache to an integrated SAP HANA liveCache on an SAP HANA database within the SUM DMO procedure, the following minimum support package (SP) levels of the SAP SCM start releases are required: SAP SCM 7.0 as of SP11, SAP SCM 7.0 EHP1 as of SP09, SAP SCM EHP2 as of SP10, or a higher SAP SCM version. For further information, see SAP Note 1825703

.The SUM DMO procedure can execute all manual steps of this SAP Note automatically, except the installation of the SAP liveCache applications and the final liveCache test with transaction LCA03. Hence make sure that SAP liveCache applications (SAP LCA or LCAPPS-Plugin) are installed on the SAP HANA database before you migrate an SCM liveCache.

Note: This additional limitation of the SAP SCM start release SP level is not necessary for migration of an SCM system without integrated SAP HANA liveCache.

If you want to use planning object structures in an SAP SCM system installed on an SAP HANA database, you have to migrate planning object structures after the SUM DMO procedure but BEFORE productive usage. For further information, see SAP Note 1818080

.SAP BW 7.00 (or higher)

Systems based on SAP NetWeaver 7.0 at least SP17 for software component SAP_BASIS and SP19 for software component SAP_BW

No alt text provided for this image

Please connect and?follow?me for the next upcoming informative articles.

Cheers :)


要查看或添加评论,请登录

Muhammad Arshad的更多文章

  • HOW TO CLEAN FIORI APPS CACHE

    HOW TO CLEAN FIORI APPS CACHE

    Introduction: In the realm of SAPUI5 application development, encountering issues with code changes not promptly…

    3 条评论
  • Export and Import tables in SAP from OS level (Control file)

    Export and Import tables in SAP from OS level (Control file)

    How to exporting and importing SAP tables using the R3trans utility, which is crucial for database transport tasks. The…

    6 条评论
  • SAP IAG Segregation of Duties (SoD) Matrix

    SAP IAG Segregation of Duties (SoD) Matrix

    SAP Identity Access Governance (IAG) provides cloud-based access risk analysis similar to SAP GRC Access Control. The…

    3 条评论
  • /hana/log is 100% full in Sap Hana

    /hana/log is 100% full in Sap Hana

    If you encounter the issue where the directory is 100% full and your system is unable to start, you may have more…

    7 条评论
  • SAP GRC Post-Installation Steps Guidance

    SAP GRC Post-Installation Steps Guidance

    I received so many request about SAP GRC High level post steps so this article provides a comprehensive checklist for…

    2 条评论
  • SAP Software Update Manager (SUM) Phases and Roadmap

    SAP Software Update Manager (SUM) Phases and Roadmap

    The SAP Software Update Manager (SUM) tool helps automate the upgrade and update processes for SAP systems, including…

    2 条评论
  • SAP ECC to S/4 HANA Conversion Part 2

    SAP ECC to S/4 HANA Conversion Part 2

    SAP ECC to S/4 HANA Conversion: Prepare Phase This document serves as a comprehensive guide for the Prepare Phase of…

    1 条评论
  • SAP ECC to S/4 HANA 2023 Conversion Part 1

    SAP ECC to S/4 HANA 2023 Conversion Part 1

    SAP has announced that support for SAP ECC will officially end in 2027. After this date, SAP will no longer provide…

    11 条评论
  • How to Configure SAP IAG Access Analysis service?

    How to Configure SAP IAG Access Analysis service?

    Configuring the SAP Identity Access Governance (IAG) Access Analysis service involves several key steps. Here’s a…

    3 条评论
  • Career in SAP GRC (Governance, Risk, and Compliance) vs. SAP Security

    Career in SAP GRC (Governance, Risk, and Compliance) vs. SAP Security

    Choosing between a career in SAP GRC (Governance, Risk, and Compliance) and SAP Security depends on your long-term…

    1 条评论

社区洞察

其他会员也浏览了